Rosie's answer
Published by SALUSFor excavations in Type A soil, the maximum allowable slope depends on the depth and duration the excavation is open. For simple slope excavations 20 feet or less in depth, the maximum allowable slope is 3/4:1 (horizontal to vertical) 1, 2. However, if the excavation is open for 24 hours or less (short term) and is 12 feet or less in depth, a maximum allowable slope of 1/2:1 is permitted 1, 2.
It's important to note that surcharge loads from stored material, equipment, or traffic can affect the required slope. A competent person must determine how much the slope needs to be reduced below the maximum allowable slope in such cases 5, 20.
This answer was preserved from its published ai.salussafety.io page. The legacy export contains no separate citation records for this answer, so SALUS has not invented any.
Keep exploring.
what are the risks on a hike
Hiking commonly involves environmental, terrain, and personal health hazards. Key risks include uneven or steep ground, wet or icy surfaces, sudden weather changes, heat or cold stress, dehydration, getting lost, and encounters with insects, snakes, or other wildlife. Snow, ice, high winds, and melting snow increase
Read the threadWrite a toolbox talk on Soft ground
Soft ground conditions create a high-risk environment because ground that appears firm can quickly lose stability due to rain, seepage, previous disturbance, vibration, loading, or nearby plant movement. In excavation work, collapse is the primary hazard, and one cubic yard of soil can weigh up to 3,000 pounds, so even
Read the threadDeep site servicing
Deep Site Servicing and Maintenance Safety ========================================== *Date:** 2025-10-03 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To ensure all personnel understand the hazards associated with deep site servicing and maintenance, and the
Read the threadToolbox talk on blindspots
Blind Spot Awareness and Mitigation =================================== *Date:** 2025-12-15 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand what blind spots are, how they contribute to accidents, and how to mitigate them to ensure a safer work
Read the threadexcavating a manhole
Pre-Task Plan: Excavating a Manhole Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME] 1. Task Description Excavation and entry into a manhole for [specific purpose, e.g., repair, inspection]. 2. Task Duration Estimated Start: [START TIME] Estimated Completion: [END TIME] 3. Personnel Involved [ROLE
Read the threadWeeping tile install
Weeping Tile Installation Safety ================================ *Date:** 2025-08-09 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective The objective of this talk is to ensure everyone understands the hazards associated with excavation work for weeping tile installation
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.