Rosie's answer

Published by SALUS

I was not able to find specific information regarding Non-Destructive Testing (NDT) requirements for foundation duty cycle work. However, I can share some general safety regulations that apply to ensure structural integrity during operation.

To ensure structural integrity during operation, it's important to adhere to a strict inspection and preventive maintenance schedule. This includes regular checks of the boom assembly, platform assembly, turntable assembly, and chassis assembly. [1] [2] [3] [4] [5] [6]

Here are key areas to consider:

  • Boom Assembly: Regularly inspect boom weldments, hose/cable carrier installations, pivot pins, pin retainers, sheaves, sheave pins, bearings, wear pads, covers, shields, and extend/retract chain or cable systems.
  • Platform Assembly: Check the platform, railing, gate, floor, rotator, and lanyard anchorage point.
  • Turntable Assembly: Inspect the swing bearing, oil coupling, swing drive system, turntable lock, hood, hood props, and hood latches.
  • Chassis Assembly: Monitor the condition of tires, wheel nuts/bolts, wheel bearings, oscillating axle/lockout cylinder systems, extendable axle systems, steer components, spindle thrust bearing/washers, and drive hubs. [1]

[2] [3] [4] [5] [6]

Additionally, ensure that all functions and controls, including platform and ground controls, function control locks, emergency stop switches, and function limit or cutout switch systems, are inspected. [7] [8] [9] [13]

Also, hydraulic and electrical systems should be checked regularly, including hydraulic pumps, cylinders, hoses, lines, fittings, reservoirs, filters, and fluid levels, as well as electrical connections, instruments, gauges, switches, and lights. [7] [8] [9] [13]

General safety measures include ensuring operation and safety manuals are in the storage box, ANSI and AEM manuals/handbooks are installed (for ANSI markets), and all capacity decals and placards are installed, secure, and legible. [7] [8] [9] [13]

Frequent inspections (pre-delivery or quarterly) and annual inspections are essential to maintaining the equipment's structural integrity and ensuring safe operation. [10] [11] [12] [14] [15] [16] [17] [18] [19] [20]

Ensure that platform and ground controls return to neutral/off when released, function control locks and emergency stop switches are working, and drive and swing brakes are effective. [18]

It is also important to check for unauthorized modifications or additions, incorporate all relevant safety publications, and ensure the general structural condition and welds are intact. [18]

By adhering to these inspection and maintenance guidelines, you can help ensure the structural integrity and safe operation of the equipment.

20 source record(s)

Sources used for this answer

[1] JLG - Boom Lifts : 680S - Service (PN 3121234)

Page 45

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Boom Assembly</td><td></td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td>Platform Assembly</td><td></td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td>Turntable Assembly</td><td></td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td>Chassis Assembly</td><td></td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td><

[2] JLG - Boom Lifts : E300AJ, E300AJP - Service (PN 31215951)

Page 42

Open source document

Source excerpt

# SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">Inspections</th></tr><tr><td>Pre-Delivery¹ or Frequent 2 (Quarterly) Inspection</td><td>Annual³ (Yearly) Inspection</td></tr><tr><td colspan="3">Functions/Controls</td></tr><tr><td>Platform Controls return to neutral/offwhen released</td><td>1,3,6,9</td><td>1,3,6,9</td></tr><tr><td>Ground Controls return to neutral/offwhen released</td><td>1,3,6,9</td><td>1,3,6,9</td></tr><tr><td>Function Control Locks, Enclosures, Guards, Boot or Detents</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Footswitch</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Emergency Stop Switches (Ground &amp; Platform) arrest all platform movement</td><td>1,3,6</td><td>1,3,6</td></tr><tr><td>Function Limit or Cutout Switch Systems</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Capacity Indicator</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Drive Brakes</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Swing Brakes</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Synchronization and Sequence system</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Auxiliary Power</td><td>1,3,9</td><td>1,3,9</td></tr><tr><td>Power System</td><td></td><td></td></tr><tr><td>Batteries</td><td>1,2</td><td>1,2</td></tr><tr><td>Battery fluid level correct</td><td>4</td><td>4</td></tr><tr><td>Battery Charger</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Motors free of damage</td><td>2</td><td>4</td></tr><tr><td>All electrical connections tight, free of frays and corrosion</td><td>1,2</td><td>1,2</td></tr><tr><td colspan="3">Hydraulic/ElectricSystem</td></tr><tr><td>Hydraulic Pumps</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hydraulic Cylinders</td><td>1,2,4,5</td><td>1,2,4,5</td></tr><tr><td>Cylinder Attachment Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Hydraulic Hoses, Lines, and Fittings</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hydraulic Reservoir, Cap, and Breather</td><td>1,2,3,4,5

[3] JLG - Boom Lifts : 1250AJP - Service (PN 3121171)

Page 47

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹or Frequent² (Quarterly) Inspection</td><td>Annual³ (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>15</td><td>15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9,11,23</td><td>9,11,23</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td></td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td></td><td>5,8</td></tr><tr><td>Outrigger or Extendable Axle Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Steer

[4] JLG - Boom Lifts : 1250AJP - Service (PN 31215058)

Page 49

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹or Frequent² (Quarterly) Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>15</td><td>15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9,11,23</td><td>9,11,23</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td>14,24</td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Outrigger or Extendable Axle Systems</td><td>5,8</td><td>5,8</td></tr><t

[5] JLG - Boom Lifts : 1250AJP - Service (PN 31217409)

Page 49

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹or Frequent² (Quarterly) Inspection</td><td>Annual³ (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>15</td><td>15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9,11,23</td><td>9,11,23</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td>14,24</td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Outrigger or Extendable Axle Systems</td><td>5,8</td><td>5,8</td></tr><t

[6] JLG - Boom Lifts : 600S, 600SJ, 660SJ - Service (PN 3121202)

Page 50

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Functions/Controls</td><td></td><td></td><td></td></tr><tr><td>Platform Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Ground Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Function Control Locks, Guards, or Detents</td><td>1,5</td><td>5</td><td></td></tr><tr><td>Footswitch</td><td>5</td><td>5</td><td></td></tr><tr><td>Emergency Stop Switches (Ground &amp; Platform)</td><td>5</td><td>5</td><td></td></tr><tr><td>Function Limit or Cutout Switch Systems</td><td>5</td><td>5</td><td></td></tr><tr><td>Drive Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Swing Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Auxiliary Power</td><td>5</td><td>5</td><td></td></tr><tr><td>Power System</td><td></td><td></td><td></td></tr><tr><td>Engine Idle, Throttle, and RPM</td><td>3</td><td>3</td><td></td></tr><tr><td>Engine Fluids (Oil, Coolant, Fuel)</td><td>9,11</td><td>11</td><td></td></tr><tr><td>Air/Fuel Filter</td><td>1,7</td><td>7</td><td></td></tr><tr><td>Exhaust System</td><td>1,9</td><td>9</td><td></td></tr><tr><td>Batteries</td><td>1,9</td><td>19</td><td></td></tr><tr><td>Battery Fluid</td><td>11</td><td>11</td><td></td></tr><tr><td>Battery Charger</td><td>5</td><td>5</td><td></td></tr><tr><td>Fuel Reservoir, Cap, and Breather</td><td>1,2,5</td><td>1,5</td><td></td></tr><tr><td>Hydraulic/Electric System</td><td></td><td></td><td></td></tr><tr><td>Hydraulic Pumps</td><td>1,2,9</td><td>1,2,9</td><td></td></tr><tr><td>Hydraulic Cylinders</td><td>1,2,7,9</td><td>1,2,9</td><td></td></tr><tr><td>Cylinder Attachment Pins and Pin Retainers</td><td>1,2,9</td><td>1,2</td><td></td></tr><tr><td>Hydraulic Hoses, Lines, and Fittings</td><td>1,2,9,1

[7] JLG - Boom Lifts : 600A, 600AJ - Service (PN 3121201)

Page 51

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td colspan="3">Boom Assembly</td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td colspan="3">Platform Assembly</td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td colspan="3">Turntable Assembly</td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td colspan="3">Chassis Assembly</td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td><td></td></tr><tr><td>Whe

[8] JLG - Boom Lifts : E300AJ, E300AJP - Service (PN 31217115)

Page 41

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">Inspections</th></tr><tr><td>Pre-Delivery¹ or Frequent 2 (Quarterly) Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td colspan="3">Boom Assembly</td></tr><tr><td>Boom Weldments</td><td>1,2</td><td>1,2</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2</td><td>1,2</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems4</td><td>1,2</td><td>1,2</td></tr><tr><td>Power Tracks/Hose Cable Installation</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td colspan="2">Platform Assembly</td><td></td></tr><tr><td>Railing</td><td>2</td><td>2</td></tr><tr><td>Gate</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Floor</td><td>2</td><td>2</td></tr><tr><td>Rotator</td><td>1,2,3,4</td><td>1,2,3,4</td></tr><tr><td>Bevel Washer</td><td>1,2,5,7</td><td>1,2,5,7</td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,6</td><td>1,2,6</td></tr><tr><td colspan="2">Turntable Assembly</td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>150,250</td><td>150,250</td></tr><tr><td>Oil Coupling</td><td>4</td><td>4</td></tr><tr><td>Swing Drive System</td><td>1,4</td><td>1,4</td></tr><tr><td>Turntable Lock</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>3</td><td>3</td></tr><tr><td colspan="3">Chassis Assembly</td></tr><tr><td>Tires</td><td>1,2</td><td>1,2</td></tr><tr><td>Wheel Nuts/Bolts</td><td>150</td><td>150</td></tr><tr><td>Wheel Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><t

[9] JLG - Boom Lifts : 680S - Service (PN 3121679)

Page 41

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Boom Assembly</td><td></td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td>Platform Assembly</td><td></td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td>Turntable Assembly</td><td></td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td>Chassis Assembly</td><td></td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td><

[10] JLG - Boom Lifts : EC600SJ, EC600SJP, H600SJ, H600SJP - Service (PN 31217161)

Page 43

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-2. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td>-</td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Outrigger or Extendable Axle Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Steer Components</td><td

[11] JLG - Boom Lifts : 800S, 860SJ - Service (PN 3121139)

Page 47

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Boom Assembly</td><td></td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td>Platform Assembly</td><td></td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td>Turntable Assembly</td><td></td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td>Chassis Assembly</td><td></td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td><

[12] JLG - Boom Lifts : 680S - Service (PN 3121234)

Page 46

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td colspan="4">Functions/Controls</td></tr><tr><td>Platform Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Ground Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Function Control Locks, Guards, or Detents</td><td>1,5</td><td>5</td><td></td></tr><tr><td>Footswitch</td><td>5</td><td>5</td><td></td></tr><tr><td>Emergency Stop Switches (Ground &amp; Platform)</td><td>5</td><td>5</td><td></td></tr><tr><td>Function Limit or Cutout Switch Systems</td><td>5</td><td>5</td><td></td></tr><tr><td>Drive Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Swing Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Auxiliary Power</td><td>5</td><td>5</td><td></td></tr><tr><td>Power System</td><td></td><td></td><td></td></tr><tr><td>Engine Idle, Throttle, and RPM</td><td>3</td><td>3</td><td></td></tr><tr><td>Engine Fluids (Oil, Coolant, Fuel)</td><td>9,11</td><td>11</td><td></td></tr><tr><td>Air/Fuel Filter</td><td>1,7</td><td>7</td><td></td></tr><tr><td>Exhaust System</td><td>1,9</td><td>9</td><td></td></tr><tr><td>Batteries</td><td>1,9</td><td>19</td><td></td></tr><tr><td>Battery Fluid</td><td>11</td><td>11</td><td></td></tr><tr><td>Battery Charger</td><td>5</td><td>5</td><td></td></tr><tr><td>Fuel Reservoir, Cap, and Breather</td><td>1,2,5</td><td>1,5</td><td></td></tr><tr><td>Hydraulic/Electric System</td><td></td><td></td><td></td></tr><tr><td>Hydraulic Pumps</td><td>1,2,9</td><td>1,2,9</td><td></td></tr><tr><td>Hydraulic Cylinders</td><td>1,2,7,9</td><td>1,2,9</td><td></td></tr><tr><td>Cylinder Attachment Pins and Pin Retainers</td><td>1,2,9</td><td>1,2</td><td></td></tr><tr><td>Hydraulic Hoses, Lines, and Fittings</td><td>1,2,9,12</td><td>1,2,9

[13] JLG - Boom Lifts : E300AJ, E300AJP - Service (PN 31215951)

Page 41

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">Inspections</th></tr><tr><td>Pre-Delivery¹ or Frequent 2 (Quarterly) Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td colspan="3">Boom Assembly</td></tr><tr><td>Boom Weldments</td><td>1,2</td><td>1,2</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2</td><td>1,2</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems4</td><td>1,2</td><td>1,2</td></tr><tr><td>Power Tracks/Hose Cable Installation</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td colspan="2">Platform Assembly</td><td></td></tr><tr><td>Railing</td><td>2</td><td>2</td></tr><tr><td>Gate</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Floor</td><td>2</td><td>2</td></tr><tr><td>Rotator</td><td>1,2,3,4</td><td>1,2,3,4</td></tr><tr><td>Bevel Washer</td><td>1,2,5,7</td><td>1,2,5,7</td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,6</td><td>1,2,6</td></tr><tr><td colspan="2">Turntable Assembly</td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>150,250</td><td>150,250</td></tr><tr><td>Oil Coupling</td><td>4</td><td>4</td></tr><tr><td>Swing Drive System</td><td>1,4</td><td>1,4</td></tr><tr><td>Turntable Lock</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>3</td><td>3</td></tr><tr><td colspan="3">Chassis Assembly</td></tr><tr><td>Tires</td><td>1,2</td><td>1,2</td></tr><tr><td>Wheel Nuts/Bolts</td><td>150</td><td>150</td></tr><tr><td>Wheel Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><t

[14] JLG - Boom Lifts : 600S, 660SJ - Service (PN 3121728)

Page 44

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Boom Assembly</td><td></td><td>14</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>9,5,15</td><td>9,5,15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td></td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td></td><td>5,8</td></tr><tr><td>Steer Components</td><td></td><td></td></tr><tr><td>Spindl

[15] JLG - Boom Lifts : 800S, 860SJ - Service (PN 3121139)

Page 48

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td colspan="4">Functions/Controls</td></tr><tr><td>Platform Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Ground Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Function Control Locks, Guards, or Detents</td><td>1,5</td><td>5</td><td></td></tr><tr><td>Footswitch</td><td>5</td><td>5</td><td></td></tr><tr><td>Emergency Stop Switches (Ground &amp; Platform)</td><td>5</td><td>5</td><td></td></tr><tr><td>Function Limit or Cutout Switch Systems</td><td>5</td><td>5</td><td></td></tr><tr><td>Drive Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Swing Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Auxiliary Power</td><td>5</td><td>5</td><td></td></tr><tr><td>Power System</td><td></td><td></td><td></td></tr><tr><td>Engine Idle, Throttle, and RPM</td><td>3</td><td>3</td><td></td></tr><tr><td>Engine Fluids (Oil, Coolant, Fuel)</td><td>9,11</td><td>11</td><td></td></tr><tr><td>Air/Fuel Filter</td><td>1,7</td><td>7</td><td></td></tr><tr><td>Exhaust System</td><td>1,9</td><td>9</td><td></td></tr><tr><td>Batteries</td><td>1,9</td><td>19</td><td></td></tr><tr><td>Battery Fluid</td><td>11</td><td>11</td><td></td></tr><tr><td>Battery Charger</td><td>5</td><td>5</td><td></td></tr><tr><td>Fuel Reservoir, Cap, and Breather</td><td>1,2,5</td><td>1,5</td><td></td></tr><tr><td>Hydraulic/Electric System</td><td></td><td></td><td></td></tr><tr><td>Hydraulic Pumps</td><td>1,2,9</td><td>1,2,9</td><td></td></tr><tr><td>Hydraulic Cylinders</td><td>1,2,7,9</td><td>1,2,9</td><td></td></tr><tr><td>Cylinder Attachment Pins and Pin Retainers</td><td>1,2,9</td><td>1,2</td><td></td></tr><tr><td>Hydraulic Hoses, Lines, and Fittings</td><td>1,2,9,12</td><td>1,2,9

[16] JLG - Boom Lifts : 1250AJP - Service (PN 31219031)

Page 49

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">INTERVAL</th></tr><tr><td>Pre-Delivery¹or Frequent² (Quarterly) Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td>Boom Assembly</td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Platform Assembly</td><td></td><td></td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Railing</td><td>1</td><td>1,2</td></tr><tr><td>Gate</td><td>1</td><td>1,5</td></tr><tr><td>Floor</td><td>1</td><td>1,2</td></tr><tr><td>Rotator</td><td>15</td><td>15</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td></tr><tr><td>Turntable Assembly</td><td></td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>1,2,14</td><td>1,2,3,13,14</td></tr><tr><td>Oil Coupling</td><td>9,11,23</td><td>9,11,23</td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td></tr><tr><td>Chassis Assembly</td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td></tr><tr><td>Wheel Nuts/Bolts</td><td>15</td><td>15</td></tr><tr><td>Wheel Bearings</td><td>14,24</td><td>14,24</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><td>5,8</td><td>5,8</td></tr><tr><td>Outrigger or Extendable Axle Systems</td><td>5,8</td><td>5,8</td></tr><t

[17] JLG - Boom Lifts : 740AJ - Service (PN 3121651)

Page 46

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Functions/Controls</td><td></td><td></td><td></td></tr><tr><td>Platform Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Ground Controls</td><td>5,6</td><td>6</td><td></td></tr><tr><td>Function Control Locks, Guards, or Detents</td><td>1,5</td><td>5</td><td></td></tr><tr><td>Footswitch</td><td>5</td><td>5</td><td></td></tr><tr><td>Emergency Stop Switches (Ground &amp; Platform)</td><td>5</td><td>5</td><td></td></tr><tr><td>Function Limit or Cutout Switch Systems</td><td>5</td><td>5</td><td></td></tr><tr><td>Drive Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Swing Brakes</td><td>5</td><td>5</td><td></td></tr><tr><td>Auxiliary Power</td><td>5</td><td>5</td><td></td></tr><tr><td>Power System</td><td></td><td></td><td></td></tr><tr><td>Engine Idle, Throttle, and RPM</td><td>3</td><td>3</td><td></td></tr><tr><td>Engine Fluids (Oil, Coolant, Fuel)</td><td>9,11</td><td>11</td><td></td></tr><tr><td>Air/Fuel Filter</td><td>1,7</td><td>7</td><td></td></tr><tr><td>Exhaust System</td><td>1,9</td><td>9</td><td></td></tr><tr><td>Batteries</td><td>1,9</td><td>19</td><td></td></tr><tr><td>Battery Fluid</td><td>11</td><td>11</td><td></td></tr><tr><td>Battery Charger</td><td>5</td><td>5</td><td></td></tr><tr><td>Fuel Reservoir, Cap, and Breather</td><td>1,2,5</td><td>1,5</td><td></td></tr><tr><td>Hydraulic/Electric System</td><td></td><td></td><td></td></tr><tr><td>Hydraulic Pumps</td><td>1,2,9</td><td>1,2,9</td><td></td></tr><tr><td>Hydraulic Cylinders</td><td>1,2,7,9</td><td>1,2,9</td><td></td></tr><tr><td>Cylinder Attachment Pins and Pin Retainers</td><td>1,2,9</td><td>1,2</td><td></td></tr><tr><td>Hydraulic Hoses, Lines, and Fittings</td><td>1,2,9,1

[18] JLG - Boom Lifts : 740AJ - Service (PN 3121651)

Page 45

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Boom Assembly</td><td></td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td>Platform Assembly</td><td></td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td>Turntable Assembly</td><td></td><td></td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td>Chassis Assembly</td><td></td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>1

[19] JLG - Boom Lifts : 600S, 600SJ, 660SJ - Service (PN 3121202)

Page 49

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="3">INTERVAL</th></tr><tr><td>Pre-Delivery¹ or Frequent² Inspection</td><td>Annual³ (Yearly) Inspection</td><td>Every 2 Years</td></tr><tr><td>Boom Assembly</td><td></td><td></td><td></td></tr><tr><td>Boom Weldments</td><td>1,2,4</td><td>1,2,4</td><td></td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2,9,12</td><td>1,2,9,12</td><td></td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td><td></td></tr><tr><td>Extend/Retract Chain or Cable Systems</td><td>1,2,3</td><td>1,2,3</td><td></td></tr><tr><td>Boom Assembly</td><td>1,2,3,4,5</td><td>1,2,3,4,5,7,9,14</td><td></td></tr><tr><td>Platform Assembly</td><td></td><td></td><td></td></tr><tr><td>Platform</td><td></td><td>1,2</td><td></td></tr><tr><td>Railing</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Gate</td><td>1,5</td><td>1,5</td><td></td></tr><tr><td>Floor</td><td>1</td><td>1,2</td><td></td></tr><tr><td>Rotator</td><td>5,9,15</td><td>5,9,15</td><td></td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,10</td><td>1,2,10</td><td></td></tr><tr><td>Turntable Assembly</td><td></td><td></td><td></td></tr><tr><td>Swing Bearing</td><td>1,2,14</td><td>1,2,3,13,14</td><td></td></tr><tr><td>Oil Coupling</td><td>9</td><td>9</td><td></td></tr><tr><td>Swing Drive System</td><td>11</td><td>11</td><td></td></tr><tr><td>Turntable Lock</td><td>1,2,5</td><td>1,2,5</td><td></td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>5</td><td>1,2,5</td><td></td></tr><tr><td>Chassis Assembly</td><td></td><td></td><td></td></tr><tr><td>Tires</td><td>16,17,18</td><td>16,17,18</td><

[20] JLG - Boom Lifts : E300AJ, E300AJP - Service (PN 31215001)

Page 41

Open source document

Source excerpt

# SECTION 2 - GENERAL (cont.) ## NOTICE (cont.) SECTION 2 - GENERAL Table 2-3. Inspection and Preventive Maintenance Schedule <table><tr><th rowspan="2">AREA</th><th colspan="2">Inspections</th></tr><tr><td>Pre-Delivery¹ or Frequent 2 (Quarterly) Inspection</td><td>Annual3 (Yearly) Inspection</td></tr><tr><td colspan="3">Boom Assembly</td></tr><tr><td>Boom Weldments</td><td>1,2</td><td>1,2</td></tr><tr><td>Hose/Cable Carrier Installations</td><td>1,2</td><td>1,2</td></tr><tr><td>Pivot Pins and Pin Retainers</td><td>1,2</td><td>1,2</td></tr><tr><td>Sheaves, Sheave Pins</td><td>1,2</td><td>1,2</td></tr><tr><td>Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Wear Pads</td><td>1,2</td><td>1,2</td></tr><tr><td>Covers or Shields</td><td>1,2</td><td>1,2</td></tr><tr><td>Extend/Retract Chain or Cable Systems4</td><td>1,2</td><td>1,2</td></tr><tr><td>Power Tracks/Hose Cable Installation</td><td>1,2,4</td><td>1,2,4</td></tr><tr><td colspan="2">Platform Assembly</td><td></td></tr><tr><td>Railing</td><td>2</td><td>2</td></tr><tr><td>Gate</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Floor</td><td>2</td><td>2</td></tr><tr><td>Rotator</td><td>1,2,3,4</td><td>1,2,3,4</td></tr><tr><td>Bevel Washer</td><td>1,2,5,7</td><td>1,2,5,7</td></tr><tr><td>Platform</td><td>1,2</td><td>1,2</td></tr><tr><td>Lanyard Anchorage Point</td><td>1,2,6</td><td>1,2,6</td></tr><tr><td colspan="2">Turntable Assembly</td><td></td></tr><tr><td>Swing Bearing or Worm Gear</td><td>150,250</td><td>150,250</td></tr><tr><td>Oil Coupling</td><td>4</td><td>4</td></tr><tr><td>Swing Drive System</td><td>1,4</td><td>1,4</td></tr><tr><td>Turntable Lock</td><td>1,2,3</td><td>1,2,3</td></tr><tr><td>Hood, Hood Props, Hood Latches</td><td>3</td><td>3</td></tr><tr><td colspan="3">Chassis Assembly</td></tr><tr><td>Tires</td><td>1,2</td><td>1,2</td></tr><tr><td>Wheel Nuts/Bolts</td><td>150</td><td>150</td></tr><tr><td>Wheel Bearings</td><td>1,2</td><td>1,2</td></tr><tr><td>Oscillating Axle/Lockout Cylinder Systems</td><t

Related Q&A

Keep exploring.

Human questionGeneral

Write a risk assessment for Moving office from 1 place to another

Office Relocation Risk Assessment and Safety Procedure ====================================================== *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This risk assessment covers the planned relocation of an

Read the thread
Human questionGeneral

Office work

Office work safety for administrative and desk-based tasks should be managed through a basic workplace health and safety program that identifies hazards, applies controls, trains staff, and reviews incidents. Key office hazards include ergonomic strain, poor lighting or air quality, repetitive work, manual handling

Read the thread
Human questionGeneral

Write a pre-task plan for Installation of FEBR door

\[PRE TASK PLAN TITLE] ====================== *Project:** \[PROJECT NAME] *Date:** 2026-05-29 *Location:** \[LOCATION] *Supervisor:** \[SUPERVISOR NAME] Task Overview This pre-task plan covers the safe installation of a FEBR fire and escape barrier door, including delivery and staging of materials, manual handling of

Read the thread
Human questionGeneral

working at Height

Working at Height: Fall Protection ================================== *Date:** 2025-09-01 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand and implement safety regulations and fall protection measures for working at height, preventing serious injuries or

Read the thread
Human questionGeneral

I'm not sure

Risk Assessment for Situations with Uncertainty =============================================== *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This risk assessment addresses the procedures for identifying, assessing

Read the thread
Human questionGeneral

Create a pre-task plan for spraying fireproofing

\[PRE TASK PLAN TITLE] ====================== *Project:** \[PROJECT NAME] *Date:** 2025-07-21 *Location:** \[LOCATION] *Supervisor:** \[SUPERVISOR NAME] Task Overview This pre-task plan outlines the safety procedures for fireproofing spray application, including hazard assessment, PPE requirements, ventilation, and

Read the thread
Discussion thread

Add your experience.

Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.

New contributions are temporarily closed while the moderation queue is configured.

Community answers(0)

No community answers have been approved yet.

Comments on Rosie's answer(0)

No comments have been approved yet.

Ready to put operational safety to work?

Join 400K users across 150K sites already on SALUS.

No commitment · 30-minute personalized walkthrough