How far should CAZ barricade be back from a trench
A person submitted this question to Rosie's free generator. The asker's identity is neither imported nor published.
Rosie's answer
Published by SALUSI am unable to provide a specific distance for Controlled Access Zone (CAZ) barricades from a trench. The provided documents do not specify a required distance. However, the documents do state that you must protect employees from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations [1]. This can be achieved by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary [1].
Sources used for this answer
[1] Safety and Health Regulations for Construction (OSHA)
Page 96
Open source documentSource excerpt
- (iv) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees. - (3) Sidewalks, pavements, and appurtenant structure shall not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures. - (j) Protection of employees from loose rock or soil. (1) Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection. - (2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. - (k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated. - (2) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective sys…
Keep exploring.
Drill site reclamation
Drill Site Reclamation and Environmental Remediation Safety =========================================================== *Date:** 2025-10-07 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To ensure all personnel understand the hazards and safety procedures associated
Read the threadCold Stress and Hypothermia
Preventing Cold Stress and Hypothermia ====================================== *Date:** 2025-10-27 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand the risks of cold stress and hypothermia, and to implement effective safety measures to protect workers in
Read the threadInstalling 50m of perf pipe ins Vancouver boulevard with power overhead in a trench 6 feet deep.
Pipeline Installation in Urban Boulevard ======================================== Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This safe work procedure outlines the necessary safety precautions for the installation of a 50m
Read the threadToolbox talk on blindspots
Blind Spot Awareness and Mitigation =================================== *Date:** 2025-12-15 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand what blind spots are, how they contribute to accidents, and how to mitigate them to ensure a safer work
Read the threadToolbox chat
Safety Talk Toolbox Meeting: Discussing Hazards and Precautions =============================================================== This safety talk toolbox meeting will focus on identifying potential hazards in the workplace and discussing the necessary precautions to mitigate those risks. Regular toolbox talks are
Read the threadWorksafebc trenching
Safe Trenching and Excavation Procedures ======================================== This document outlines the WorkSafeBC guidelines for safe trenching and excavation procedures. It includes shoring and sloping requirements to prevent cave-ins and ensure worker safety, in compliance with occupational health and safety
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.