Published by SALUSSafe Work Procedure: Trenching
Document Number: [SWP-NUMBER] Revision Date: [DATE] Next Review Date: [NEXT REVIEW DATE] Department: [DEPARTMENT NAME]
1. Scope
This Safe Work Procedure (SWP) outlines the safety requirements and procedures for trenching activities to protect workers from cave-ins, falling materials, and other hazards associated with trenching work. It applies to all trenching operations where workers are required to enter a trench that is more than 1.2 meters deep [1].
This SWP covers the steps to be followed before, during, and after trenching operations, including hazard identification, risk assessment, control measures, and emergency procedures.
This SWP should be used in conjunction with other relevant safety procedures and regulations, including those related to excavation, confined spaces, and underground utilities [2].
2. Definitions
Competent Person A person who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them [2].
Excavation Any man-made cut, cavity, trench, or depression in an earth surface, formed by earth removal [2].
Shoring An assembly of structural members designed to prevent earth or material from falling or sliding into an excavation [3].
Spoil Pile Material excavated from an excavation, trench, tunnel or excavated shaft [3].
Trench A narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 m) [4].
Temporary Protective Structure A structure or device in an excavation, trench, tunnel or excavated shaft that is designed to provide protection from cave-ins, collapse, sliding or rolling materials, and includes shoring, boxes, trench shields and similar structures [3].
3. Responsibilities
3.1 Supervisors
- Ensure that a competent person inspects the trench daily and documents the inspection [1].
- Ensure that workers are trained and competent to perform trenching tasks [1].
- Provide and maintain all necessary equipment and PPE [1].
- Ensure that all underground utilities are located and marked before excavation begins [5].
3.2 Workers
- Follow all safe work procedures and instructions [6].
- Use required PPE and equipment properly [1].
- Report any hazards or unsafe conditions to the supervisor immediately [1].
- Do not enter any trench that is not properly protected [7].
3.3 Health and Safety Representative
- Assist in the development and review of safe work procedures [1].
- Participate in incident investigations and recommend corrective actions [1].
- Monitor the effectiveness of safety programs and procedures [1].
4. Potential Hazards and Risks
| Hazard | Risk | Control Measures |
|---|---|---|
| Cave-ins | Injury or death due to entrapment and suffocation | Slope or shore trench walls, use trench boxes or shields [1]. |
| Falling materials | Injury from being struck by falling rocks, soil, or equipment | Keep spoil piles at least 1 meter from the edge of the trench, scale loose materials from trench walls [5]. |
| Underground utilities | Electrocution, explosion, or exposure to hazardous materials | Locate and mark all underground utilities before digging, use hand digging methods near utilities [5]. |
| Hazardous atmosphere | Asphyxiation, poisoning, or explosion | Test for hazardous gases and oxygen deficiency before entering the trench, provide ventilation [8]. |
| Water accumulation | Drowning or collapse of trench walls | Use pumps or other methods to remove water, monitor water levels [8]. |
| Slips, trips, and falls | Injuries ranging from minor to severe | Maintain good housekeeping, ensure proper access and egress [6]. |
| Equipment strike | Injury or death from contact with equipment | Use spotters, establish exclusion zones, ensure equipment operators are trained [9]. |
5. Personal Protective Equipment (PPE)
Proper PPE must be worn at all times during trenching operations to minimize the risk of injury [1].
- Hard hat - Protects the head from falling objects [1].
- Safety glasses - Protects the eyes from dust, debris, and chemical splashes [1].
- Safety boots - Provides foot protection from punctures, impacts, and crushing hazards [1].
- High-visibility vest - Increases visibility to equipment operators and other workers [1].
- Gloves - Protects hands from cuts, abrasions, and chemical exposure [1].
Inspect all PPE before each use for damage or defects. Replace any damaged or defective PPE immediately [1].
6. Equipment and Tools
Use the right tool for the job and inspect all equipment before use to ensure it is in good working condition [1].
- Excavator/Backhoe - Used for digging and moving large amounts of soil [1].
- Shovels - Used for manual digging and moving soil [1].
- Ladders - Used for safe access and egress from the trench [6].
- Gas detectors - Used to monitor the air quality in the trench for hazardous gases and oxygen levels [8].
- Water pumps - Used to remove water from the trench [8].
Inspect all equipment daily before use. Remove any damaged or defective equipment from service [1].
7. Pre-Job Requirements
7.1 Training and Competency
- All workers involved in trenching operations must be trained in safe work procedures, hazard identification, and the proper use of PPE and equipment [1].
- A competent person must be trained in excavation safety and be able to identify and correct hazards [2].
- Operators of excavation equipment must be trained and certified to operate the equipment safely [1].
7.2 Pre-Job Briefing
- Conduct a pre-job briefing with all workers involved to discuss the scope of work, potential hazards, and control measures [1].
- Review the safe work procedure and ensure that all workers understand their roles and responsibilities [1].
- Discuss emergency procedures and contact information [1].
7.3 Work Area Preparation
- Identify and mark all underground utilities in the area [5].
- Establish a clear work zone and barricade the area to prevent unauthorized access [10].
- Ensure that there is adequate lighting and ventilation in the trench [8].
- Locate all emergency equipment, such as first aid kits and fire extinguishers [8].
8. Safe Work Procedure Steps
Step 1: Excavation
Carefully excavate the trench to the required dimensions, taking care not to damage any underground utilities [5].
- Use appropriate excavation equipment for the job [1].
- Maintain a safe distance from the edge of the trench [5].
- Ensure that spoil piles are located at least 1 meter away from the edge of the trench [5].
Safety considerations: Be aware of the location of underground utilities and avoid damaging them. Ensure that the excavation is stable and does not pose a cave-in hazard [5].
Step 2: Install Protective System
Install a protective system to prevent cave-ins, such as sloping, shoring, or trench boxes [1].
- Ensure that the protective system is appropriate for the soil type and trench depth [1].
- Follow the manufacturer's instructions for installing and using the protective system [1].
- Inspect the protective system regularly for damage or defects [1].
Safety considerations: Never enter a trench that is not properly protected. Ensure that the protective system is installed correctly and is in good working condition [1].
Step 3: Entry and Work in Trench
Enter the trench using a safe means of access, such as a ladder or ramp, and perform the necessary work [6].
- Ensure that the ladder or ramp is securely in place and extends at least 1 meter above the top of the trench [6].
- Wear appropriate PPE, including a hard hat, safety glasses, and safety boots [1].
- Monitor the air quality in the trench for hazardous gases and oxygen levels [8].
Safety considerations: Be aware of the potential for cave-ins, falling materials, and hazardous atmospheres. Follow all safe work procedures and instructions [1].
9. Precautions and Safety Measures
- Competent Person Inspection: A competent person must inspect the trench daily before the start of work and after any event that could affect its stability, such as rain or vibration [1].
- Underground Utilities: Always locate and mark all underground utilities before digging. Use hand digging methods near utilities to avoid damage [5].
- Sloping and Shoring: Slope or shore trench walls to prevent cave-ins. The type of protection required depends on the soil type and trench depth [1].
- Spoil Piles: Keep spoil piles at least 1 meter away from the edge of the trench to prevent materials from falling back into the excavation [5].
- Access and Egress: Provide a safe means of access and egress, such as a ladder or ramp, located within 8 meters of any worker in the trench [6].
10. Emergency Procedures
10.1 General Emergency Response
- In the event of an emergency, immediately evacuate the trench and call for help [1].
- Provide first aid to any injured workers [1].
- Secure the area to prevent further injuries [1].
10.2 Specific Emergency Scenarios
- Cave-in: Evacuate the area and call for emergency services. Do not attempt to rescue anyone without proper training and equipment [1].
- Utility Strike: Evacuate the area and notify the utility company immediately. Do not approach the area until it has been declared safe [5].
- Hazardous Atmosphere: Evacuate the trench and provide ventilation. Do not re-enter the trench until the air quality has been tested and is safe [8].
10.3 Emergency Contact Information
- Emergency Services: 911
- [Company Safety Officer]: [PHONE NUMBER]
- [Project Supervisor]: [PHONE NUMBER]
11. Incident Reporting and Investigation
Report all incidents, near-misses, and hazards to the supervisor immediately [1].
Investigate all incidents to determine the root cause and implement corrective actions to prevent recurrence [1].
12. References and Related Documents
- Occupational Health and Safety Regulations [1]
- Company Safety Policy [1]
- Excavation Safety Standards [1]
Approved by: [NAME AND POSITION] Date: [APPROVAL DATE]
Safety powered by SALUS
Sources used for this answer
[1] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)
Page 143
Open source documentSource excerpt
## OCCUPATIONAL HEALTH AND SAFETY, 2020 ## Application of Part 17-2 This Part applies to excavations, trenches, tunnels and excavated shafts other than excavations, trenches, tunnels and excavated shafts that are governed by The Mines Regulations . 31 Dec 2020 c S-15.1 Reg 10 s17-2. ## Locating underground pipelines, etc. - 17-3 (1) An employer or contractor shall accurately establish the location of all underground pipelines, cables and conduits in an area where work is to be done and shall ensure that those locations are conspicuously marked: - (a) before commencing work using power tools or powered mobile equipment on an excavation, trench, tunnel, excavated shaft or borehole; or - (b) before breaking ground surface with any equipment to a depth that may contact underground utilities. - (2) If an operation is to be undertaken involving the disturbance of soil within 600 millimetres of an existing pipeline, cable or conduit, an employer or contractor shall ensure that the pipeline, cable or conduit is exposed by hand digging or other approved method before mechanical excavating is allowed to begin within that area. - (3) If an operation mentioned in subsection (2) exposes a pipeline, cable or conduit, an employer or contractor shall ensure that the pipeline, cable or conduit is supported to prevent any damage during backfilling and any subsequent settlement of the ground. - (4) If there is contact with or damage to an underground pipeline, cable or conduit, an employer or contractor shall immediately: - (a) notify the owner of the pipeline, cable or conduit that contact or damage has occurred; and - (b) take steps to protect the health and safety of any worker who may be at risk until any unsafe condition resulting from the contact or damage is repaired or corrected. 31 Dec 2020 c S-15.1 Reg 10 s17-3. ## Excavating and trenching - 17-4 (1) An employer or contractor shall ensure that: - (a) before excavating or trenching begins, if the stability of a struct…
[2] Safety and Health Regulations for Construction (OSHA)
Page 91
Open source documentSource excerpt
## 29 CFR 1926 (OSHA) ## Subpart P-Excavations AUTHORITY: Sec. 107, Contract Worker Hours and Safety Standards Act (Construction Safety Act) (40 U.S.C. 333); Secs. 4, 6, 8, Occupational Safety and Hea1th Act of 1970 (29 U.S.C. 653, 655, 657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR [redacted postal code]), or 9-83 (48 FR [redacted postal code]), as applicable, and 29 CFR part 1911. SOURCE: 54 FR [redacted postal code], Oct. 31, 1989, unless otherwise noted. ## §1926.650 Scope, application, and definitions applicable to this subpart. (a) Scope and application. This subpart applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. ## (b) Definitions applicable to this subpart. Accepted engineering practices means those requirements which are compatible with standards of practice required by a registered professional engineer. Aluminum Hydraulic Shoring means a pre-engineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins. Bell-bottom pier hole means a type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape. Benching (Benching system) means a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Cave-in means the separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person. Competent person means one who is capable of…
[3] Safety and Health Regulations for Construction (OSHA)
Page 93
Open source documentSource excerpt
## 29 CFR 1926 (OSHA) Support system means a structure such as underpinning, bracing, or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation. Tabulated data means tables and charts approved by a registered professional engineer and used to design and construct a protective system. Trench (Trench excavation) means a narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench. Trench box. See 'Shield.' ## Trench shield. See 'Shield.' Uprights means the vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called 'sheeting.' Wales means horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth. ## §1926.651 Specific excavation requirements. - (a) Surface encumbrances. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. - (b) Underground installations. (1) The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation. - (2) Utility companies or…
[4] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)
Page 141
Open source documentSource excerpt
## PART 17 ## Excavations, Trenches, Tunnels and Excavated Shafts ## Definitions for Part 17-1 In this Part: 'sheeting' means the members of a shoring system that retain the earth in position and, in turn, are supported by other members of the shoring system, and includes uprights placed so that individual members are closely spaced, in contact with or interconnected to each other; 'shoring' means an assembly of structural members designed to prevent earth or material from falling or sliding into an excavation; 'spoil pile' means material excavated from an excavation, trench, tunnel or excavated shaft; 'temporary protective structure' means a structure or device in an excavation, trench, tunnel or excavated shaft that is designed to provide protection from cave-ins, collapse, sliding or rolling materials, and includes shoring, boxes, trench shields and similar structures; 'type 1 soil' means soil that most closely exhibits the following characteristics: - (a) is hard in consistency, very dense in compactive condition and, if a standard penetration test is performed, has a standard penetration resistance of greater than 50 blows per 300 millimetres; - (b) can be penetrated only with difficulty by a small, sharp object; - (c) has a dry appearance; - (d) has no signs of water seepage; - (e) can be excavated only by mechanical equipment; - (f) does not include previously excavated soils; 'type 2 soil' means soil that most closely exhibits the following characteristics: - (a) is very stiff in consistency, dense in compactive condition and, if a standard penetration test is performed, has a standard penetration resistance of 30 to 50 blows per 300 millimetres; - (b) can be penetrated with moderate difficulty by a small, sharp object; - (c) is difficult to excavate with hand tools; - (d) has a low to medium natural moisture content and a damp appearance after it is excavated; - (e) has no signs of water seepage; - (f) does not include p…
[5] General Regulation (N.B. Reg. 91-191)
Page 168
Open source documentSource excerpt
## Support where heavy equipment used near edge 181 (3) Where powered mobile equipment or a mobile crane is used near the edge of an excavation or trench, an employer shall ensure that any shoring, bracing or ca -ging for the excavation or trench is adequate to support the increased pressure. ## Certificate of engineer respecting support 181 (4) An employer shall ensure that shoring, bracing or caging for an excavation or trench is certified as ade -quate by an engineer and shall make the proof of the cer -tification available to an officer on request. 2001-33 ## Entering excavation or trench 182 (1) An employer shall ensure that an employee does not, and no employee shall, enter an excavation or trench 1.2 m or more in depth unless - (a) the walls of the excavation or trench are sup -ported by shoring, bracing or caging, the excavation or trench is cut in solid rock or the excavation or trench is sloped or benched to within 1.2 m of the bot -tom of the excavation or trench with the slope not ex -ceeding 1 m of vertical rise to each 1 m of horizontal run, - (b) subsections 181(2), (3) and (4) have been com -plied with, - (c) loose material that may fall into the excavation or trench has been removed, and - (d) a ladder that extends at least 1 m above the ex -cavation or trench is installed no more than 15 m from where the employee is working or some other safe means of access and egress is provided. - 182 (2) Notwithstanding subsection (1), an employee may enter an excavation 1.2 m or more in depth to install bracing if the employee remains a distance from the face of the excavation equal to or greater than the depth of the excavation. ## Soutènement des parois si utilisation de matériel lourd 181 (3) Lorsqu'un équipement mobile à moteur ou une grue mobile est utilisé près du bord d'une excavation ou d'une tranchée, l'employeur doit s'assurer que tout étayage, tout étrésillonnement ou tout encagemen…
[6] Safety and Health Regulations for Construction (OSHA)
Page 95
Open source documentSource excerpt
## 29 CFR 1926 (OSHA) - (iii) Adequate precaution shall be taken such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of the gas. - (iv) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe. - (2) Emergency rescue equipment. (i) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use. - (ii) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, shall wear a harness with a life-line securely attached to it. The lifeline shall be separate from any line used to handle materials, and shall be individually attended at all times while the employee wearing the lifeline is in the excavation. - (h) Protection from hazards associated with water accumulation. (1) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. - (2) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. - (3) If excavation work interrupts the natural drainage of surface …
[7] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)
Page 146
Open source documentSource excerpt
## OCCUPATIONAL HEALTH AND SAFETY, 2020 - (3) An employer or contractor shall ensure that a temporary protective structure in an excavation more than 3 metres deep is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. 31 Dec 2020 c S-15.1 Reg 10 s17-6. ## Protection against cave-in of trenches - 17-7 (1) If a worker is present in a trench that is more than 1.2 metres deep, an employer or contractor shall ensure that the worker is protected from cave-ins or sliding material by: - (a) cutting back the upper portion of the walls of the trench in accordance with subsection 17-4(2); - (b) installing a temporary protective structure; or - (c) a combination of cutting back the walls to the slope specified in subsection 17-4(2) and installing a temporary protective structure that extends at least 300 millimetres above the base of the cut-back. - (2) An employer or contractor shall ensure that a temporary protective structure required by clause (1) (b) or (c) is: - (a) designed and installed using shoring made of number 1 structural grade spruce lumber having the dimensions set out in Table 14 of the Appendix for the type of soil and the depth of the trench or made of material of equivalent or greater strength; or - (b) designed by a professional engineer and constructed, installed, used, maintained and dismantled in accordance with that design. - (3) An employer or contractor shall ensure that a temporary protective structure in a trench more than 6 metres deep in type 1, type 2 or type 3 soil or in a trench more than 4 metres deep in type 4 soil is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. - (4) An employer or contractor shall ensure that: - (a) shoring is installed and removed in a manner that protects workers from cave-ins and structural collapses and from being struck …
[8] Occupational Health and Safety Code
Page 235
Open source documentSource excerpt
- 457 (4) Despite section 456, an employer may install additional protection certified by a professional engineer in trenches to compensate for passing vehicular traffic, working machinery or a heavy object placed within a distance equal to the depth of the trench, measured from the near edge of the bottom of the trench to the traffic, machinery or heavy object. - 457 (5) Despite section 456, an employer may install additional protection certified by a professional engineer in a trench to compensate for the stress created because the trench is adjacent to or abuts a building or other structure. ## Installation of shoring, stringers or bracing - 458 (1) An employer must ensure that a worker who installs shoring, stringers or bracing uses a ladder and works down from the top of the trench, installing each brace in descending order. - 458 (2) An employer must ensure that a worker who removes shoring, stringers or bracing uses a ladder and works upward from the bottom of the trench, removing each brace in ascending order. - 458 (3) A worker must install shoring, stringers or bracing in accordance with subsection (1) and remove them in accordance with subsection (2). - 458 (4) Despite subsections (2) and (3), if the quality of the ground in which a trench has been dug has deteriorated during operations to the extent that it is unsafe to use the method of removal required by subsection (2), an employer must ensure that the shoring, stringers or bracing are removed using a method that does not require the worker to be in the trench. ## Access for powered mobile equipment - 459 An employer must ensure that the open side of an excavation or a route used by powered mobile equipment to gain access to an excavation has a barrier high enough to stop the equipment from sliding or rolling into the excavation. ## Dumping block - 460 An employer must ensure that if powered mobile equipment may go over a bank or enter a dump opening while it is discharging its load, the equipme…
[9] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)
Page 147
Open source documentSource excerpt
## OCCUPATIONAL HEALTH AND SAFETY, 2020 S-15.1 REG 10 - (6) If a worker is required to enter a trench, an employer or contractor shall: - (a) install ladders, stairways or ramps to provide a safe means of entrance to and exit from the trench; and - (b) ensure that the ladder, stairway or ramp is located not more than 8 metres from a worker working in the trench. - (7) An employer or contractor shall ensure that workers are instructed in and comply with the requirements of this section. 31 Dec 2020 c S-15.1 Reg 10 s17-7. ## Excavated shafts and tunnels - 17-8 (1) An employer or contractor shall ensure that: - (a) during excavating, the walls of an excavated shaft or tunnel are retained by temporary protective structures that are adequate: - (i) for the type of soil; and - (ii) to prevent collapse or cave-in of the walls of the excavated shaft or tunnel; - (b) during the excavating of an excavated shaft that is 3 metres or more deep or of a tunnel, the walls of the shaft or tunnel are retained by temporary protective structures designed and certified by a professional engineer to be adequate for the protection of workers in the shaft or tunnel and constructed, installed, used, maintained and dismantled in accordance with that design; - (c) a solid or wire mesh fence at least 1 metre high, or other equally effective means of preventing material from falling into an excavated shaft or the surface opening of a tunnel, is provided around that shaft or opening; and - (d) substantial gates that are not less than 1 metre high are installed in every opening in a fence provided pursuant to clause (c) and the gates are kept closed except when being used. - (2) A worker who opens a gate mentioned in clause (1) (d) shall close the gate after the worker no longer has a need to keep the gate open. - (3) An employer or contractor shall provide suitable equipment to keep a tunnel or excavated shaft free from any accumulation of water. 31 Dec 2020 c S-15.1 Reg 10 s17-8. ## Bor…
[10] Canada Occupational Health and Safety Regulations (SOR/86-304)
Page 39
Open source documentSource excerpt
- (b) be secured in such a manner that it cannot be dislodged accidentally from its position. - (3) Where, because of the nature of the location or of the work being done, a portable ladder cannot be securely fastened in place, it shall, while being used, be sloped so that the base of the ladder is not less than one-quarter and not more than one-third of the length of the ladder from a point directly below the top of the ladder and at the same level as the base. - (4) Every portable ladder that provides access from one level to another shall extend at least three rungs above the higher level. - (5) Metal or wire-bound portable ladders shall not be used if there is a risk that they could come into contact with any live electrical circuit or equipment. - (6) No employee shall work from any of the three top rungs of any single or extension portable ladder or from either of the two top steps of any portable step ladder. SOR/88-632, s. 7(F); SOR/2019-246, s. 20(E); SOR/2022-94, s. 5(F). ## Excavation - 3.12 (1) Before the commencement of work on a tunnel, excavation or trench, the employer shall mark the location of all underground pipes, cables and conduits in the area where the work is to be done. - (2) Where an excavation or trench constitutes a hazard to employees, a highly visible barricade shall be installed around it. - (3) In a tunnel or in an excavation or trench that is more than 1.4 m deep and whose sides are sloped at an angle of 45 ° or more to the horizontal - (a) the walls of the tunnel, excavation or trench, and - (b) the roof of the tunnel - shall be supported by shoring and bracing that is installed as the tunnel, excavation or trench is being excavated. - (4) Subsection ( 3 ) does not apply in respect of a trench where the employer provides a system of shoring composed of steel plates and bracing, welded or bolted together, that can support the walls of the trench from the …
Keep exploring.
rail construction
Rail Construction and Maintenance Safety ======================================== Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This safe work procedure (SWP) outlines the safety requirements for all rail construction and maintenance
Read the threadCreate a site orientation that meet compliance to BC, Canada
For construction or industrial worksites in British Columbia, site orientation and worker onboarding should be treated as a mandatory, documented, site-specific process under the Workers Compensation Act framework and the Occupational Health and Safety Regulation. At minimum, every young or new worker must receive
Read the threadGive me a audit for a construction site
Safety Audit Checklist for Construction Site Hazard Identification and Risk Assessment ====================================================================================== This checklist provides a framework for conducting safety audits on construction sites, focusing on hazard identification and risk assessment. It
Read the threadfor a site attendance, what questions should be asked?
During a site attendance or site visit, the key safety objective is to confirm that hazards have been identified, risks assessed, and effective controls implemented before and during the work. A strong site visit should test whether the work is planned, supervised, communicated, and carried out in compliance with the
Read the threadWrite a risk assessment for Blending
Risk Assessment for Blending Operations ======================================= *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This assessment covers routine blending operations in a production or processing area
Read the threadOn completion of study, a case study exam is following.It will consist of 3 workplace scenarios and will cover a variety of aspects…
Health and Safety Best Practices in Debswana Mining =================================================== This document outlines the health and safety best practices, hazard identification, risk assessment, legal requirements, prevention strategies, emergency response, incident reporting procedures, ethical
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.