Toolbox Talk: Duct Bank Demolition Safety

Date: [DATE] Duration: [DURATION] minutes Presenter: [PRESENTER NAME] Location: [LOCATION]

Objective

The objective of this toolbox talk is to ensure all workers understand the hazards associated with duct bank demolition and the necessary safety procedures to prevent injuries and incidents. By the end of this talk, participants should be able to identify potential hazards, implement appropriate control measures, and follow safe work procedures during duct bank demolition activities.

Introduction

Duct bank demolition involves specific hazards that require careful planning and execution. This talk will cover key safety aspects to ensure everyone understands the risks and how to mitigate them. Demolition work can be dangerous, and it's crucial to follow established procedures to protect ourselves and others.

Presenter Note: Engage the audience by asking if anyone has personal experience related to the topic.

Key Points

  • Engineering Survey: Prior to demolition, a competent person must conduct an engineering survey to assess the structure's condition and prevent unplanned collapses [1].
  • Hazardous Materials: Identify and remove any hazardous substances before starting demolition 2, 6.
  • Utility Disconnection: Ensure all utilities are disconnected and capped before demolition begins 2, 4, 6, 19.
  • Safe Work Procedures: Implement and follow safe work procedures, especially when using powered mobile equipment [2].
  • PPE Requirements: Use appropriate personal protective equipment (PPE) to protect against potential hazards 3, 5, 8, 9, 11, 12, 13, 14, 16.

Hazard Identification

  • Unplanned Collapse: The possibility of unplanned collapse of the structure during demolition can cause serious injuries or fatalities [1].
  • Hazardous Substances: Exposure to hazardous chemicals or biological substances during demolition can lead to health issues 2, 4, 5, 6, 8, 9, 11, 12, 13, 14, 16, 19.
  • Falling Materials: Falling debris and materials can cause injuries to workers and others in the vicinity 6, 15, 19.

Presenter Note: Encourage participants to share any additional hazards they've encountered.

Control Measures

  • Engineering Controls: Shore or brace walls and floors in structures damaged by fire, flood, or explosion [1].
  • Administrative Controls: Develop and implement safe work procedures for demolition activities, including the use of powered mobile equipment [2].
  • Personal Protective Equipment (PPE): Ensure all workers wear appropriate PPE, including hard hats, safety glasses, and steel-toed boots 3, 5, 8, 9, 11, 12, 13, 14, 16.
  • Isolation: Disconnect and cap all utility lines (electric, gas, water, etc.) before starting demolition 2, 4, 6, 19.

Safe Work Procedures

  1. Conduct a Site Survey: Before starting any demolition work, perform a thorough site survey to identify potential hazards and structural weaknesses [1].
  2. Disconnect Utilities: Ensure all electrical, gas, water, and other service lines are disconnected and capped 2, 4, 6, 19.
  3. Establish a Demolition Zone: Create a demolition zone to prevent unauthorized personnel from entering the area [3].
  4. Use Proper Equipment: Use the correct equipment for the demolition task, and ensure it is in good working condition 3, 5, 7, 8, 9, 11, 12, 13, 14, 16.
  5. Control Dust and Debris: Implement dust control measures and manage debris to prevent overloading structures [4].

Presenter Note: If possible, demonstrate the safe work procedure or use visual aids.

Personal Protective Equipment (PPE) Requirements

  • Hard Hats: Always wear a hard hat to protect against falling debris 3, 5, 8, 9, 11, 12, 13, 14, 16.
  • Safety Glasses: Use safety glasses to protect your eyes from dust and flying particles 3, 5, 8, 9, 11, 12, 13, 14, 16.
  • Steel-Toed Boots: Wear steel-toed boots to protect your feet from heavy objects and sharp materials 3, 5, 8, 9, 11, 12, 13, 14, 16.

[Emphasize the importance of proper PPE use and maintenance]

Real-World Example or Case Study

[Provide a detailed description of a relevant real-world scenario or case study]

[Discuss what went wrong or right, and the lessons learned]

Presenter Note: Ask participants if they can relate this example to their own experiences.

Group Discussion

Discuss the following questions:

  1. What are the most common hazards you've encountered during demolition work?
  2. How can we improve our current demolition procedures to enhance safety?
  3. What steps should be taken if unexpected hazardous materials are discovered during demolition?

Presenter Note: Encourage active participation and facilitate the discussion.

Emergency Procedures

  1. Evacuate: In case of a structural collapse or other emergency, evacuate the area immediately.
  2. First Aid: Provide first aid to any injured personnel.
  3. Report: Report the incident to the supervisor and relevant authorities.
  4. Investigate: Conduct a thorough investigation to determine the cause of the incident and prevent future occurrences.

Questions and Answers

[Encourage participants to ask questions]

[Provide answers to common questions related to the topic]

  • Q: What should I do if I suspect asbestos is present?

A: Stop work immediately and notify your supervisor. Do not disturb the material.

  • Q: How often should we inspect our PPE?

A: Inspect your PPE before each use to ensure it is in good condition.

  • Q: What is the safe distance to maintain from demolition equipment?

A: Maintain a minimum distance of 10 meters (33 feet) from demolition equipment 5, 8, 9, 11, 12, 13, 14, 16.

Summary

[Recap the main points covered in the toolbox talk]

  • Conduct thorough site surveys before starting demolition [1].
  • Ensure all utilities are disconnected and hazardous materials are removed 2, 4, 5, 6, 8, 9, 11, 12, 13, 14, 16, 19.
  • Use appropriate PPE and follow safe work procedures 3, 5, 7, 8, 9, 11, 12, 13, 14, 16.
  • Establish and maintain a safe demolition zone [3].

Action Items

[List specific actions participants should take following this toolbox talk]

  1. Review and understand the site-specific demolition plan.
  2. Inspect your PPE before each shift.
  3. Report any hazards or concerns to your supervisor immediately.

Remember: Safety First, Every Task, Every Time!

Report all hazards, near-misses, and incidents to your supervisor immediately.

Safety powered by SALUS

4 source record(s)

Sources used for this answer

[1] Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Page 934

Open source document

Source excerpt

## PREPARATORY OPERATIONS ## SUBDIVISION T ## DEMOLITION Authority: 40 U.S.C. 3701; 29 U.S.C. 653, 655, 657; and Secretary of Labor's Orders 12-71 (36 FR 8754), 8-76 (41 FR [redacted postal code]), 9-83(48 FR [redacted postal code]), 1-90 (55 FR 9033), 6-96 (62FR 111), 5-2007 (72 FR [redacted postal code]), or 1-2012 (77FR 3912), as applicable. [75 FR [redacted postal code], Aug. 9, 2010; 77 FR [redacted postal code], Aug. 17, 2012; 78 FR [redacted postal code], April 23, 2013] ## §1926.850 Preparatory Operations. - (a) Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed. - (b) When employees are required to work within a structure to be demolished which has been damaged by fire, flood, explosion, or other cause, the walls or floor shall be shored or braced. - (c) All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance. - (d) If it is necessary to maintain any power, water or other utilities during demolition, such lines shall be temporarily relocated, as necessary, and protected. - (e) It shall also be determined if any type of hazardous chemicals, gases, explosives, flammable materials, or similarly dangerous substances have been used in any pipes, tanks, or other equipment on the property. When the presence of any such substances is apparent or suspected, testing and purging shall be performed and the hazard eliminated before demolition is started. - (f) Where a hazard e

[2] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 202

Open source document

Source excerpt

S-15.1 REG 10 ## OCCUPATIONAL HEALTH AND SAFETY, 2020 ## Before demolition begins - 27-2 (1) Before a demolition begins, an employer, contractor or owner shall ensure that: - (a) all chemical or biological substances that may be hazardous to workers during demolition are removed from the structure or the part of the structure that is being demolished; - (b) all glass is removed from the structure or the part of the structure that is being demolished; and - (c) subject to subsection (2), all gas, electrical, telecommunications, sewer and water services connected to the structure or the part of the structure that is being demolished are disconnected. - (2) If power is required for illumination or other purposes, an employer, contractor or owner shall provide a suitably located temporary power service. 31 Dec 2020 c S-15.1 Reg 10 s27-2. ## Stability of adjacent structures - 27-3 If the demolition of a structure may affect the stability of an adjoining structure, an employer, contractor or owner shall ensure that: - (a) the demolition is carried out in accordance with procedures certified in writing by a professional engineer to safeguard the stability of the adjoining structure; and - (b) a copy of the procedures required by clause (a) is kept at the worksite during demolition. 31 Dec 2020 c S-15.1 Reg 10 s27-3. ## Requirements re workers - 27-4 In a demolition, an employer, contractor or owner shall: - (a) appoint a competent supervisor to be in charge of the demolition at all times that the work is in progress; - (b) ensure that all workers or equipment are located clear of any falling material; and - (c) if a worker is or may be present in a building during its demolition, ensure that the demolition is performed floor by floor from the top downward. 31 Dec 2020 c S-15.1 Reg 10 s27-4. ## Demolition procedures - 27-5 In a demolition, an employer, contractor or owner shall ensure that: - (a) dust from the demolition is controlled to the

[3] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 203

Open source document

Source excerpt

## OCCUPATIONAL HEALTH AND SAFETY, 2020 - (c) any opening or hole in a floor, roof or other surface on which workers are required or permitted to walk or stand is guarded or covered as required by section 9-13; - (d) a free-standing scaffold is used in the demolition of a building shaft from the inside; - (e) steel structures are dismantled column length by column length and tier by tier from the top downward; and - (f) no wall or other part of the structure being demolished is left in an unstable condition or in danger of accidental collapse except during the actual demolition of that wall or part of the structure. 31 Dec 2020 c S-15.1 Reg 10 s27-5. ## Material chutes - 27-6 (1) An employer, contractor or owner shall ensure that a material chute steeper than 45 from the horizontal is constructed to enclose the material placed ° in the chute. - (2) If a material chute presents a danger to workers, an employer, contractor or owner shall ensure that a guardrail is installed around the top of the chute to prevent workers from falling into the chute. 31 Dec 2020 c S-15.1 Reg 10 s27-6. ## Structural members - 27-7 (1) An employer, contractor or owner shall ensure that structural members that are being removed are not under any stress other than the member's own weight and are secured or supported to prevent any unexpected movement. - (2) If a structural member is being hoisted by a crane or other similar lifting device from a structure being demolished or from the demolition rubble, an employer, contractor or owner shall ensure that the hoisting line is in a vertical position and is over the centre of gravity of the load in a manner that will reduce the danger to workers from a swinging or uncontrolled load. 31 Dec 2020 c S-15.1 Reg 10 s27-7. ## Use of powered mobile equipment 27-8 (1) Before powered mobile equipment is placed on a floor, roof or other surface on which workers are required or permitted to walk or stand for the purpose of d

[4] Occupational Safety General Regulations (N.S. Reg. 44/99)

Page 89

Open source document

Source excerpt

- (a) the area designated as such in writing by an engineer before the demolition begins; or - (b) in the absence of a designation under clause (a), the area having its centre at the point of demolition and having a horizontal radius equal to 1 1/2 times the initial height of the project, or portion of the project being demolished. - (2 ) This Section applies to demolition by - (a) a heavy weight suspended by cable from a crane or other hoist; or - (b) a power shovel, bulldozer or other powered mobile equipment. - (3) An employer shall ensure that no person, other than persons directly engaged in the demolition, enters or remains within the demolition zone while the project is being demolished. - (4) Where a swinging weight is used for demolition, an employer shall ensure that the supporting cable is of such length or so restrained that the weight will not swing against any object other than the project being demolished. - (5) Where it is required to prevent the uncontrolled collapse of a project that may endanger a person at or near the workplace, an employer shall ensure that structural components are identified in an adequate manner to ensure the components are not removed inadvertently. - (6) Where an operator of equipment referred to in subsection (2) cannot see where the material from the demolition will fall, the employer shall ensure that a signaller guides the operator. - (7) Where the demolition involves undercutting structural supports, an employer shall - establish an adequate written procedure certified by an engineer for the demolition. Subsection 165(7) added: O.I.C. 2000-130, N.S. Reg. 52/2000; amended: O.I.C. 2013-65, N.S. Reg. 53/2013. [Note: Section 165 effective April 28, 1999.] ## Part 14 - Excavations and Trenches 166 - (1) Where a person may enter an excavation or trench and a wall of an excavation or trench is greater than 1.2 m in height, an employer shall ensure that the wall is supported by adequate shoring or bracing, or that an adequ

Related Q&A

Keep exploring.

Human questionGeneral

Write a toolbox talk on Proper Hazard Identification?

Hazard Identification and Risk Assessment ========================================= *Date:** 2026-01-29 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand and apply hazard identification and risk assessment procedures in compliance with safety regulations

Read the thread
Human questionGeneral

Prepare risk assessment form for constuction site

A risk assessment form for a construction site should include several key components to ensure a thorough evaluation of potential hazards and the implementation of appropriate control measures. Here's a structured approach to creating such a form: Hazard Identification: 1, 10 The form should prompt the assessor to

Read the thread
Human questionGeneral

Safety moment on dam construction project

Dam Construction Safety: Hazard Identification, Risk Assessment, and Incident Prevention ======================================================================================== *Date:** 2025-08-10 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective The objective of this

Read the thread
Human questionGeneral

Build a 1000 componet JHA

Job Hazard Analysis for 1000-Component Assembly Process ======================================================== *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This Job Hazard Analysis (JHA) covers the assembly of a

Read the thread
Human questionGeneral

Prepare me a loto procedure topic

Toolbox Talk: Lockout/Tagout (LOTO) Procedures *Date:** [DATE] *Duration:** [DURATION] minutes *Presenter:** [PRESENTER NAME] *Location:** [LOCATION] Objective The objective of this toolbox talk is to ensure that all employees understand the importance of Lockout/Tagout (LOTO) procedures and are able to implement them

Read the thread
Human questionGeneral

Jobsite hazards

Toolbox Talk: Jobsite Hazards *Date:** [DATE] *Duration:** [DURATION] minutes *Presenter:** [PRESENTER NAME] *Location:** [LOCATION] Objective The objective of this toolbox talk is to raise awareness about common jobsite hazards and provide practical steps to mitigate these risks, ensuring a safer work environment for

Read the thread
Discussion thread

Add your experience.

Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.

New contributions are temporarily closed while the moderation queue is configured.

Community answers(0)

No community answers have been approved yet.

Comments on Rosie's answer(0)

No comments have been approved yet.

Ready to put operational safety to work?

Join 400K users across 150K sites already on SALUS.

No commitment · 30-minute personalized walkthrough