Pre-Task Plan: Excavation for Pipe

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Excavation of a trench for the installation of a new pipe [1], including locating underground utilities [2], excavating the trench to the required depth, installing the pipe, and backfilling the trench.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Excavator Operator
  • Pipe Layer
  • Competent Person

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Cave-ins/Sliding Material [1]Entrapment, burial, or injury to workers [1]Ensure a protective system is in place for trenches more than 1.2 meters deep, such as sloping, shoring, or trench boxes [3]. A competent person must inspect the excavation daily for potential cave-in hazards [4].
Underground Utilities (pipelines, cables, conduits) [2]Electrocution, explosion, or exposure to hazardous materials [5]Before excavating, accurately establish the location of all underground pipelines, cables, and conduits and ensure they are conspicuously marked [2]. Contact utility companies to locate underground installations prior to excavation [6]. If disturbing soil within 600mm of a utility, expose the utility by hand digging or other approved method before mechanical excavating begins [2].
Falling Loads/EquipmentInjury to workersKeep materials and equipment at least 2 feet (.61 m) from the edge of excavations, or use retaining devices [4].
Hazardous Atmospheres [5]Exposure to explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, or toxic atmospheres [5]Test the atmosphere in the excavation for oxygen deficiency, flammable gases, and toxic substances, especially in confined spaces or areas with potential for gas leaks [7]. Provide ventilation if necessary [7].
Water AccumulationDrowning, cave-inDo not work in excavations with accumulated water unless adequate precautions have been taken [7]. Use water removal equipment and monitor its operation [7].
Instability of Adjacent StructuresCollapse of structuresIf the stability of a structure may be affected by the excavation, support the structure with a temporary protective structure designed by a professional engineer [2].

5. Required PPE for Today's Task

  • Hard hat
  • Safety glasses
  • Steel-toe boots
  • High-visibility vest
  • Gloves

6. Tools and Equipment Needed

  • Excavator
  • Shoring or trench box (if required)
  • Shovels
  • Hand tools
  • Pipe laying equipment
  • Gas detector
  • Ladder

7. Pre-Start Checklist

Area Preparation

  • [ ] Ensure underground utilities have been located and marked [2].
  • [ ] Establish a clear and safe work zone, including barricades and signage.
  • [ ] Check for overhead obstructions (power lines, trees).

Equipment Checks

  • [ ] Inspect the excavator for proper functioning and safety features.
  • [ ] Inspect shoring or trench box for damage and ensure it meets requirements [3].
  • [ ] Ensure gas detector is calibrated and functioning properly.

Communication

  • [ ] Conduct a pre-task briefing with all workers involved.
  • [ ] Establish hand signals or other communication methods for equipment operation.
  • [ ] Review emergency procedures and contact information.

8. Task Steps Overview

  1. Locate and mark underground utilities [2].
  2. Excavate trench to required depth and width [1].
  3. Install shoring or trench box if required [3].
  4. Lay pipe and make connections.
  5. Backfill trench and compact soil.

9. Emergency Response for This Task

  • Cave-in → Immediately evacuate the area and contact emergency services.
  • Gas leak → Evacuate the area, shut off equipment, and notify the gas company.
  • Injury → Provide first aid and contact emergency services if needed.

10. Task-Specific Precautions

  • No worker shall enter an unprotected trench that is 1.2 meters or more in depth [3].
  • A competent person must inspect the excavation daily [4].
  • Keep equipment and spoil piles at least 1 meter from the edge of the excavation [2].

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS

7 source record(s)

Sources used for this answer

[1] Safety and Health Regulations for Construction (OSHA)

Page 96

Open source document

Source excerpt

- (iv) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees. - (3) Sidewalks, pavements, and appurtenant structure shall not be undermined unless a support system or another method of protection is provided to protect employees from the possible collapse of such structures. - (j) Protection of employees from loose rock or soil. (1) Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection. - (2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. - (k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated. - (2) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective sys

[2] Safety and Health Regulations for Construction (OSHA)

Page 92

Open source document

Source excerpt

## 29 CFR 1926 (OSHA) Failure means the breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities. Hazardous atmosphere means an atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury. Kickout means the accidental release or failure of a cross brace. Protective system means a method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection. Ramp means an inclined walking or working surface that is used to gain access to one point from another, and is constructed from earth or from structural materials such as steel or wood. Registered Professional Engineer means a person who is registered as a professional engineer in the state where the work is to be performed. However, a professional engineer, registered in any state is deemed to be a 'registered professional engineer' within the meaning of this standard when approving designs for 'manufactured protective systems' or 'tabulated data' to be used in interstate commerce. Sheeting means the members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system. Shield (Shield system) means a structure that is able to withstand the forces imposed on it by a cavein and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with §1926.652 (c)(3) or (c)(4). Shields used in trenches are usually referred to

[3] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 143

Open source document

Source excerpt

## OCCUPATIONAL HEALTH AND SAFETY, 2020 ## Application of Part 17-2 This Part applies to excavations, trenches, tunnels and excavated shafts other than excavations, trenches, tunnels and excavated shafts that are governed by The Mines Regulations . 31 Dec 2020 c S-15.1 Reg 10 s17-2. ## Locating underground pipelines, etc. - 17-3 (1) An employer or contractor shall accurately establish the location of all underground pipelines, cables and conduits in an area where work is to be done and shall ensure that those locations are conspicuously marked: - (a) before commencing work using power tools or powered mobile equipment on an excavation, trench, tunnel, excavated shaft or borehole; or - (b) before breaking ground surface with any equipment to a depth that may contact underground utilities. - (2) If an operation is to be undertaken involving the disturbance of soil within 600 millimetres of an existing pipeline, cable or conduit, an employer or contractor shall ensure that the pipeline, cable or conduit is exposed by hand digging or other approved method before mechanical excavating is allowed to begin within that area. - (3) If an operation mentioned in subsection (2) exposes a pipeline, cable or conduit, an employer or contractor shall ensure that the pipeline, cable or conduit is supported to prevent any damage during backfilling and any subsequent settlement of the ground. - (4) If there is contact with or damage to an underground pipeline, cable or conduit, an employer or contractor shall immediately: - (a) notify the owner of the pipeline, cable or conduit that contact or damage has occurred; and - (b) take steps to protect the health and safety of any worker who may be at risk until any unsafe condition resulting from the contact or damage is repaired or corrected. 31 Dec 2020 c S-15.1 Reg 10 s17-3. ## Excavating and trenching - 17-4 (1) An employer or contractor shall ensure that: - (a) before excavating or trenching begins, if the stability of a struct

[4] Safety and Health Regulations for Construction (OSHA)

Page 93

Open source document

Source excerpt

## 29 CFR 1926 (OSHA) Support system means a structure such as underpinning, bracing, or shoring, which provides support to an adjacent structure, underground installation, or the sides of an excavation. Tabulated data means tables and charts approved by a registered professional engineer and used to design and construct a protective system. Trench (Trench excavation) means a narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench. Trench box. See 'Shield.' ## Trench shield. See 'Shield.' Uprights means the vertical members of a trench shoring system placed in contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called 'sheeting.' Wales means horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth. ## §1926.651 Specific excavation requirements. - (a) Surface encumbrances. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. - (b) Underground installations. (1) The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation. - (2) Utility companies or

[5] Safety and Health Regulations for Construction (OSHA)

Page 95

Open source document

Source excerpt

## 29 CFR 1926 (OSHA) - (iii) Adequate precaution shall be taken such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of the gas. - (iv) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe. - (2) Emergency rescue equipment. (i) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use. - (ii) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, shall wear a harness with a life-line securely attached to it. The lifeline shall be separate from any line used to handle materials, and shall be individually attended at all times while the employee wearing the lifeline is in the excavation. - (h) Protection from hazards associated with water accumulation. (1) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. - (2) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. - (3) If excavation work interrupts the natural drainage of surface

[6] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 146

Open source document

Source excerpt

## OCCUPATIONAL HEALTH AND SAFETY, 2020 - (3) An employer or contractor shall ensure that a temporary protective structure in an excavation more than 3 metres deep is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. 31 Dec 2020 c S-15.1 Reg 10 s17-6. ## Protection against cave-in of trenches - 17-7 (1) If a worker is present in a trench that is more than 1.2 metres deep, an employer or contractor shall ensure that the worker is protected from cave-ins or sliding material by: - (a) cutting back the upper portion of the walls of the trench in accordance with subsection 17-4(2); - (b) installing a temporary protective structure; or - (c) a combination of cutting back the walls to the slope specified in subsection 17-4(2) and installing a temporary protective structure that extends at least 300 millimetres above the base of the cut-back. - (2) An employer or contractor shall ensure that a temporary protective structure required by clause (1) (b) or (c) is: - (a) designed and installed using shoring made of number 1 structural grade spruce lumber having the dimensions set out in Table 14 of the Appendix for the type of soil and the depth of the trench or made of material of equivalent or greater strength; or - (b) designed by a professional engineer and constructed, installed, used, maintained and dismantled in accordance with that design. - (3) An employer or contractor shall ensure that a temporary protective structure in a trench more than 6 metres deep in type 1, type 2 or type 3 soil or in a trench more than 4 metres deep in type 4 soil is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. - (4) An employer or contractor shall ensure that: - (a) shoring is installed and removed in a manner that protects workers from cave-ins and structural collapses and from being struck

[7] Safety and Health Regulations for Construction (OSHA)

Page 91

Open source document

Source excerpt

## 29 CFR 1926 (OSHA) ## Subpart P-Excavations AUTHORITY: Sec. 107, Contract Worker Hours and Safety Standards Act (Construction Safety Act) (40 U.S.C. 333); Secs. 4, 6, 8, Occupational Safety and Hea1th Act of 1970 (29 U.S.C. 653, 655, 657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR [redacted postal code]), or 9-83 (48 FR [redacted postal code]), as applicable, and 29 CFR part 1911. SOURCE: 54 FR [redacted postal code], Oct. 31, 1989, unless otherwise noted. ## §1926.650 Scope, application, and definitions applicable to this subpart. (a) Scope and application. This subpart applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. ## (b) Definitions applicable to this subpart. Accepted engineering practices means those requirements which are compatible with standards of practice required by a registered professional engineer. Aluminum Hydraulic Shoring means a pre-engineered shoring system comprised of aluminum hydraulic cylinders (crossbraces) used in conjunction with vertical rails (uprights) or horizontal rails (walers). Such system is designed, specifically to support the sidewalls of an excavation and prevent cave-ins. Bell-bottom pier hole means a type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape. Benching (Benching system) means a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Cave-in means the separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person. Competent person means one who is capable of

Related Q&A

Keep exploring.

Human questionCanada

List best practice in regards to a site orientation that meet compliance to BC, Canada

In British Columbia, construction site orientation should be treated as a documented, site-specific process completed before work begins, especially for young or new workers. At minimum, orientation must cover the worker’s supervisor contact information; worker and employer rights and responsibilities; reporting unsafe

Read the thread
Human questionGeneral

Trench

Safe Work Procedure: Trenching Document Number: [SWP-NUMBER] Revision Date: [DATE] Next Review Date: [NEXT REVIEW DATE] Department: [DEPARTMENT NAME] 1. Scope This Safe Work Procedure (SWP) outlines the safety requirements and procedures for trenching activities to protect workers from cave-ins, falling materials, and

Read the thread
Discussion thread

Add your experience.

Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.

New contributions are temporarily closed while the moderation queue is configured.

Community answers(0)

No community answers have been approved yet.

Comments on Rosie's answer(0)

No comments have been approved yet.

Ready to put operational safety to work?

Join 400K users across 150K sites already on SALUS.

No commitment · 30-minute personalized walkthrough