Published by SALUSRisk Assessment for Elevated Work =================================
Assessment Date: \[DATE]
Assessor: \[ASSESSOR NAME]
Department/Area: \[DEPARTMENT/AREA]
Review Date: \[REVIEW DATE]
1\. Assessment Scope
This risk assessment covers all elevated work activities, including but not limited to work on ladders, scaffolds, aerial lifts, and roofs. It includes the use of fall protection equipment and emergency rescue procedures associated with these activities. Excluded from this assessment are activities involving energized electrical work, which require a separate specific risk assessment.
2\. Risk Assessment Methodology
This risk assessment employs a 5x5 risk matrix to determine risk ratings. The hierarchy of controls (Elimination, Substitution, Engineering Controls, Administrative Controls, and PPE) will be used to identify and implement control measures.
3\. Risk Matrix Reference
The following matrix is used to evaluate risk levels based on likelihood and severity:
| Likelihood |
|---|
| Rare | Unlikely | Possible | Likely | Almost Certain | | Severity | Catastrophic | Low | Low | Medium | Medium | High | | Major | Low | Medium | Medium | High | Extreme | | Moderate | Medium | Medium | High | Extreme | Extreme | | Minor | Medium | High | High | Extreme | Extreme | | Negligible | High | High | Extreme | Extreme | Extreme |
4\. Hazard Identification and Risk Evaluation
1\. Falls from height due to inadequate fall protection
Potential Consequences: Serious injury or fatality due to falls.
Affected Persons: Workers, public, and visitors
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Likely | Major | High |
Control Measures
- Eliminate the need to work at height by performing tasks at ground level whenever possible.
- Use prefabrication techniques to minimize work at height.
- Install guardrails and safety nets to prevent falls.
- Implement a permit-to-work system for all elevated work.
- Ensure workers use appropriate fall protection equipment (harnesses, lanyards, lifelines).
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Major | Medium |
2\. Ladder collapse or failure
Potential Consequences: Injuries from falls due to ladder failure.
Affected Persons: Workers
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Major | Medium |
Control Measures
- Ensure proper training on ladder safety and inspection.
- Use ladders that meet safety standards (e.g., ANSI, CSA).
- Implement a ladder inspection program.
- Ensure ladders are placed on stable surfaces and secured properly.
- Prohibit the use of damaged or defective ladders.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Minor | Low |
3\. Scaffold collapse
Potential Consequences: Serious injuries or fatalities from scaffold collapse.
Affected Persons: Workers, public
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Major | Medium |
Control Measures
- Inspect scaffolds before each use by a competent person.
- Ensure proper scaffold erection and dismantling by qualified personnel.
- Provide adequate access and egress to scaffolds.
- Ensure scaffolds are stable and erected on solid ground.
- Use guardrails, mid-rails, and toe boards on all scaffolds.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Rare | Moderate | Low |
4\. Aerial lift accidents (falls, electrocution, tip-overs)
Potential Consequences: Serious injuries or fatalities from aerial lift accidents.
Affected Persons: Workers
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Major | Medium |
Control Measures
- Ensure operators are trained and certified to operate aerial lifts.
- Inspect aerial lifts before each use.
- Maintain safe distances from overhead power lines.
- Use fall protection equipment while working in aerial lifts.
- Ensure proper grounding of aerial lifts.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Moderate | Medium |
5\. Falls from roofs
Potential Consequences: Serious injuries or fatalities from roof falls.
Affected Persons: Workers
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Likely | Major | High |
Control Measures
- Conduct regular roof inspections to identify hazards.
- Install guardrails or safety nets on roof edges.
- Use fall protection equipment (harnesses, lanyards, lifelines) when working near roof edges.
- Mark and barricade skylights and roof openings.
- Provide training on safe roof work practices.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Moderate | Medium |
6\. Inadequate emergency rescue procedures
Potential Consequences: Delays in rescue leading to more severe injuries or fatalities.
Affected Persons: Workers
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Moderate | Medium |
Control Measures
- Develop and implement a comprehensive emergency rescue plan.
- Provide rescue training to designated personnel.
- Ensure availability of rescue equipment (e.g., rescue harnesses, ropes, lowering devices).
- Establish communication protocols for emergencies.
- Conduct regular rescue drills.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Rare | Minor | Low |
5\. General Control Measures
- Implement a comprehensive fall protection program that includes hazard identification, risk assessment, control measures, training, and equipment inspection.
- Conduct regular safety meetings to discuss elevated work hazards and safe work practices.
- Ensure all workers involved in elevated work are competent and properly trained.
- Provide appropriate personal protective equipment (PPE), including hard hats, safety glasses, and gloves.
- Implement a strict housekeeping policy to prevent slips, trips, and falls.
6\. Emergency Preparedness
- Establish a detailed emergency rescue plan specific to the types of elevated work being performed. This plan should include self-rescue, assisted rescue, and professional rescue procedures.
- Provide comprehensive training to all workers on emergency rescue procedures, including how to recognize signs of suspension trauma and how to properly use rescue equipment.
- Ensure that appropriate rescue equipment is readily available and inspected regularly. This may include rescue harnesses, ropes, lowering devices, and first aid kits.
- Establish clear communication protocols for emergency situations, including contact information for emergency services and designated rescue personnel.
- Conduct regular emergency rescue drills to ensure the effectiveness of the rescue plan and the competency of rescue personnel.
7\. Training Requirements
- Fall Protection Equipment Training: Workers must be trained on the proper selection, inspection, use, and maintenance of fall protection equipment, including harnesses, lanyards, and lifelines.
- Ladder Safety Training: Training should cover ladder safety standards, inspection procedures, proper ladder setup, and safe climbing techniques.
- Scaffold Safety Training: Training must include scaffold erection and dismantling procedures, hazard identification, fall protection requirements, and safe work practices on scaffolds.
- Aerial Lift Operator Training: Training should cover aerial lift operation, inspection, fall protection, electrical hazards, and emergency procedures.
- Roof Safety Training: Training must include hazard identification, fall protection requirements, safe work practices, and emergency procedures for roof work.
8\. Monitoring and Review
Review Frequency: Annually, or after any incident
| Monitoring Type | Frequency | Responsible Party | Description |
|---|---|---|---|
| Regular Inspection | Monthly | Safety Officer | Regular inspections of all fall protection equipment to ensure it is in good working condition. |
| Audit | Quarterly | Safety Manager | Periodic audits of elevated work activities to verify compliance with safety procedures and regulations. |
| Incident Review | After each incident | Safety Committee | Review of incident reports and near-miss investigations to identify trends and areas for improvement. |
| Environmental Monitoring | Daily | Site Supervisor | Monitoring of weather conditions to determine if elevated work should be postponed due to high winds, rain, or other adverse conditions. |
| Observation | Daily | Site Supervisor | Ensure workers wear the seat belt while operating the machine to reduce the risk of personal injury. [1] |
9\. Special Circumstances
- Elevated work during adverse weather conditions (e.g., high winds, rain, snow) significantly increases the risk of falls. Ensure work is postponed or additional precautions are taken.
- Working at height at night or in low-light conditions requires additional lighting and visibility measures.
- Lone workers performing elevated work require additional monitoring and communication protocols to ensure their safety.
Approval and Sign-off
This risk assessment has been reviewed and approved by:
Assessor: _________________________ Date: __________
Manager/Supervisor: _________________________ Date: __________
Safety Representative: _________________________ Date: __________
This risk assessment must be reviewed annually, or after any incident or when significant changes occur.
Safety powered by SALUS
Sources used for this answer
[1] TEREX TH1048C / TH1056C - Operator's Manual (PN 236506)
Page 22
Open source documentSource excerpt
# GENERAL SAFETY PROCEDURES (cont.) ## WARNING (cont.) ! # GENERAL SAFETY ! # GENERAL SAFETY PROCEDURES ! CAUTION ## USE SEAT BELT Always wear the seat belt while operating the machine to reduce the risk of personal injury. ! ## CAUTION ## PRACTICE SAFE MAINTENANCE Unauthorized modifications to the machine may impair the safety, machine function and/or affect machine life. ALWAYS use a safety support or brace when working on, under, or around the machine or forks. DO NOT adjust or lubricate the machine while it is in motion. SHUT OFF the engine and LOCKOUT the ignition while working on the machine unless maintenance instructions require the engine to be running. REPLACE all the shields and guards after servicing. NEVER use the machine as a platform for lifting personnel. ! ## CAUTION ## BOOM SAFETY DO NOT enter the DANGER AREA under or around the boom when the forks are off the ground or while the engine is running. (See diagram at right for DANGER AREA). Serious personal injury could result if the boom should unexpectedly drop. Before ANY work is performed in the DANGER AREA the boom must be COMPLETELY lowered and the forks must be resting on the ground. in irm ==0 Ind - SERVICE MANUAL MANTENANCE UNITED THAN DANGER 0 2-6
Keep exploring.
Write a risk assessment for House refurbishment
For house refurbishment and renovation works, the risk assessment should be task-specific, site-specific, and reviewed as the job changes. Under UK good practice and CDM principles, start by identifying hazards, who may be harmed, existing controls, and additional controls required, then communicate the findings to all
Read the threadWrite a risk assessment for Write a risk assessment and a method statement for infrastructure
A suitable RAMS for infrastructure works should begin with a task-by-task risk assessment and method statement covering the sequence of work, hazards, persons at risk, initial risk rating, controls, residual risk, supervision, competence, permits, emergency arrangements, and inspection requirements. The risk assessment
Read the threadworking at Height
Working at Height: Fall Protection ================================== *Date:** 2025-09-01 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand and implement safety regulations and fall protection measures for working at height, preventing serious injuries or
Read the threadWrite a toolbox talk on railway
A railway safety toolbox talk should begin with the rule that no one goes on or near the line without an authorized safe system of work, a task briefing, and a clear understanding of hazards, limits, and emergency arrangements. Key rail work hazards include moving trains and on-track plant, electrical hazards from
Read the threadElevator Contractor Safety
Toolbox Talk: Elevator Contractor Safety *Date:** [DATE] *Duration:** [DURATION] minutes *Presenter:** [PRESENTER NAME] *Location:** [LOCATION] Objective To ensure all elevator contractors understand the safety standards, hazard identification, control measures, and safe work procedures necessary for working with
Read the threadabc
Safety Regulations and Hazard Assessments for ABC Systems ========================================================= *Date:** 2025-12-17 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective Understand and apply safety regulations and hazard assessments related to ABC
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.