Safe Work Procedure: Trench Safety

Document Number: [SWP-NUMBER] Revision Date: [DATE] Next Review Date: [NEXT REVIEW DATE] Department: [DEPARTMENT NAME]

1. Scope

This procedure covers the safe practices for working in and around trenches, including entry, exit, and protection against cave-ins. It applies to all trenching activities on site and is intended to prevent accidents and injuries related to trench work.

This procedure applies to all work environments where trenching is performed, including construction sites and maintenance operations.

Related procedures include the Occupational Health and Safety Regulations and any site-specific safety plans.

2. Definitions

Trench A narrow excavation made below the surface of the ground, where the depth is greater than the width, but the width is not greater than 15 feet (4.6 m) at the bottom.

Protective System Methods of protecting employees from cave-ins, including support systems, sloping, benching, and shield systems.

Shoring A structure that supports the sides of an excavation to prevent cave-ins.

3. Responsibilities

3.1 Supervisors

  • Ensure all workers are trained in trench safety procedures.
  • Verify that protective systems are in place and properly maintained.
  • Conduct regular inspections of trench sites.

3.2 Workers

  • Follow all safety procedures and use protective equipment as required.
  • Report any unsafe conditions to supervisors immediately.
  • Participate in safety training and briefings.

3.3 Health and Safety Representative

  • Monitor compliance with safety regulations.
  • Assist in the investigation of incidents related to trench work.

4. Potential Hazards and Risks

HazardRiskControl Measures
Cave-insBurial, suffocationUse of protective systems like shoring or trench boxes [1]
Falling objectsInjury from falling materialsKeep spoil piles at least 1 meter from the trench edge [2]
Hazardous atmospheresToxic exposure, asphyxiationTest for hazardous gases and ensure proper ventilation [2]

5. Personal Protective Equipment (PPE)

Proper PPE is essential for trench safety.

  • Hard hats - Protect against falling objects.
  • Safety boots - Provide foot protection from heavy materials.
  • High-visibility vests - Ensure visibility to machinery operators.
  • Respirators - Required if hazardous atmospheres are present.
  • Gloves - Protect hands from sharp objects and materials.

Inspect PPE before use and maintain it according to manufacturer guidelines.

6. Equipment and Tools

Proper equipment and tools are crucial for safe trench operations.

  • Ladders - Provide safe access and egress from trenches.
  • Trench boxes - Protect workers from cave-ins.
  • Shoring systems - Support trench walls to prevent collapse.
  • Gas detectors - Monitor air quality in trenches.
  • Pumps - Remove water accumulation from trenches.

Inspect equipment regularly and maintain it according to manufacturer guidelines.

7. Pre-Job Requirements

7.1 Training and Competency

Workers must be trained in trench safety, including the use of protective systems and emergency procedures.

7.2 Pre-Job Briefing

Conduct a briefing to cover the scope of work, potential hazards, and safety measures.

7.3 Work Area Preparation

Ensure the trench area is clear of obstructions and that spoil piles are placed at a safe distance.

8. Safe Work Procedure Steps

Step 1: Site Assessment

Conduct a thorough assessment of the trench site.

  • Identify potential hazards.
  • Determine the type of soil and appropriate protective systems.
  • Ensure all underground utilities are marked [3].

Step 2: Installation of Protective Systems

Install protective systems as required by the depth and soil type.

  • Use shoring, trench boxes, or sloping as appropriate [1].
  • Ensure systems are certified by a professional engineer if necessary [4].

Step 3: Safe Entry and Exit

Ensure safe access and egress for workers.

  • Install ladders or ramps within 8 meters of workers [4].
  • Ensure ladders extend at least 1 meter above the trench edge [5].

9. Precautions and Safety Measures

  • Ensure trenches are inspected daily and after any event that could increase hazards.
  • Do not work under suspended loads or near the edge of the trench.
  • Keep heavy equipment away from trench edges to prevent collapse.
  • Use barriers and warning signs to prevent unauthorized access.
  • Ensure proper ventilation to prevent hazardous atmospheres.

10. Emergency Procedures

10.1 General Emergency Response

In case of an emergency, evacuate the trench immediately and alert emergency services.

10.2 Specific Emergency Scenarios

  • Cave-in - Evacuate and call emergency services.
  • Hazardous gas detection - Evacuate and ventilate the area.
  • Water accumulation - Use pumps to remove water and evacuate if necessary.

10.3 Emergency Contact Information

[List of emergency contacts and their phone numbers]

11. Incident Reporting and Investigation

Report all incidents, near-misses, and hazards to supervisors immediately. Investigate incidents to determine root causes and implement corrective actions.

12. References and Related Documents

  • Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)
  • Occupational Safety General Regulations (N.S. Reg. 44/99)
  • Canada Occupational Health and Safety Regulations (SOR/86-304)

Approved by: [NAME AND POSITION] Date: [APPROVAL DATE]

Safety powered by SALUS

5 source record(s)

Sources used for this answer

[1] Kobelco SK235SR-2, SK235SRLC-2 Operation Manual

Page 43

Open source document

Source excerpt

## R. WORKING AROUND UNDER GROUND UTILITY LINES During operation it is likely that you will be working around or near buried utility lines which may include, but are not limited to: - -Electrical Power Line - -Gas Line - -Water Line - -Communication Line: Telephone or Cable Television Before begining any trenching, drilling or other construction work it is your responsibility to be aware of all such utility lines buried in the area of your project and to avoid them. ALWAYS have all local utility companies mark the location of their lines. Check with local authorities for laws, regulations and/or strict penalties requiring you to locate and avoid existing utilities. ## S. RESTRICTED WORK AREAS In work sites with limited height and swing / traveling areas such as tunnels, bridges, around electrical power lines, other utilities, or inside structures. Use extreme caution on work sites with limited height and swing/traveling areas such as tunnels, bridges, around electrical power lines, other utilities or inside structure. Keep the machine and its attachment a safe distance to prevent injury, death or damage on equipment or structure. Use a flagman to guide the operators. ## T. DO NOT WORK UNDER PRECIPICE / OVERHANG Do not dig under the precipice. It may cause falling rocks or loosening of the precipice resulting in injury, death or machine damage. <!-- image --> <!-- image --> <!-- image --> 1

[2] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 147

Open source document

Source excerpt

## OCCUPATIONAL HEALTH AND SAFETY, 2020 S-15.1 REG 10 - (6) If a worker is required to enter a trench, an employer or contractor shall: - (a) install ladders, stairways or ramps to provide a safe means of entrance to and exit from the trench; and - (b) ensure that the ladder, stairway or ramp is located not more than 8 metres from a worker working in the trench. - (7) An employer or contractor shall ensure that workers are instructed in and comply with the requirements of this section. 31 Dec 2020 c S-15.1 Reg 10 s17-7. ## Excavated shafts and tunnels - 17-8 (1) An employer or contractor shall ensure that: - (a) during excavating, the walls of an excavated shaft or tunnel are retained by temporary protective structures that are adequate: - (i) for the type of soil; and - (ii) to prevent collapse or cave-in of the walls of the excavated shaft or tunnel; - (b) during the excavating of an excavated shaft that is 3 metres or more deep or of a tunnel, the walls of the shaft or tunnel are retained by temporary protective structures designed and certified by a professional engineer to be adequate for the protection of workers in the shaft or tunnel and constructed, installed, used, maintained and dismantled in accordance with that design; - (c) a solid or wire mesh fence at least 1 metre high, or other equally effective means of preventing material from falling into an excavated shaft or the surface opening of a tunnel, is provided around that shaft or opening; and - (d) substantial gates that are not less than 1 metre high are installed in every opening in a fence provided pursuant to clause (c) and the gates are kept closed except when being used. - (2) A worker who opens a gate mentioned in clause (1) (d) shall close the gate after the worker no longer has a need to keep the gate open. - (3) An employer or contractor shall provide suitable equipment to keep a tunnel or excavated shaft free from any accumulation of water. 31 Dec 2020 c S-15.1 Reg 10 s17-8. ## Bor

[3] Occupational Safety General Regulations (N.S. Reg. 44/99)

Page 91

Open source document

Source excerpt

- (b) where a trench cage is used, within the trench cage. - 168 An employer shall ensure that excavated material is - (a) kept at least 1 m away from the edge of an excavation or trench, unless an engineer certifies a shorter distance as adequate; and - (b) located a sufficient distance from the edge of the excavation or trench to ensure the excavated material does not re-enter the excavation or trench. Clause 168(b) amended: O.I.C. 2000-130, N.S. Reg. 52/2000. - 169 (1) An employer shall ensure that an excavation or trench in which a person works is kept reasonably free of water. - (2) Where a person may be exposed to a hazardous substance or to an oxygen rich atmosphere in an excavation or trench, an employer shall ensure that, before the person enters the excavation or trench, - (a) testing is performed to - (I) determine the concentration of any hazardous gas, vapour or dust, flammables, the concentration of oxygen and oxygen deficiency in the atmosphere in the immediate area of the excavation or trench where the work is to be performed, - (ii) ensure that the concentration of a chemical substance or a mixture of chemical substances in the excavation or trench does not exceed its occupational exposure limit under Part 2: Occupational Health of the Workplace Health and Safety Regulations made under the Act or 50% of its lower explosive limit, and - (iii) ensure that the level of oxygen in the atmosphere in the excavation or trench is not less than 19.5 % and not more than 22.5 %, unless the employer can demonstrate that an unsafe oxygen level is not possible in the circumstances; and Clause 169(2)(a) replaced: O.I.C. 2013-65, N.S. Reg. 53/2013. - (b) adequate precautions are taken to reduce the risk of injury to a person. Subsection 169(2) replaced: O.I.C. 2000-130, N.S. Reg. 52/2000. - (3 ) No person shall store hazardous substances in an excavation or trench. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\

[4] Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Page 146

Open source document

Source excerpt

## OCCUPATIONAL HEALTH AND SAFETY, 2020 - (3) An employer or contractor shall ensure that a temporary protective structure in an excavation more than 3 metres deep is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. 31 Dec 2020 c S-15.1 Reg 10 s17-6. ## Protection against cave-in of trenches - 17-7 (1) If a worker is present in a trench that is more than 1.2 metres deep, an employer or contractor shall ensure that the worker is protected from cave-ins or sliding material by: - (a) cutting back the upper portion of the walls of the trench in accordance with subsection 17-4(2); - (b) installing a temporary protective structure; or - (c) a combination of cutting back the walls to the slope specified in subsection 17-4(2) and installing a temporary protective structure that extends at least 300 millimetres above the base of the cut-back. - (2) An employer or contractor shall ensure that a temporary protective structure required by clause (1) (b) or (c) is: - (a) designed and installed using shoring made of number 1 structural grade spruce lumber having the dimensions set out in Table 14 of the Appendix for the type of soil and the depth of the trench or made of material of equivalent or greater strength; or - (b) designed by a professional engineer and constructed, installed, used, maintained and dismantled in accordance with that design. - (3) An employer or contractor shall ensure that a temporary protective structure in a trench more than 6 metres deep in type 1, type 2 or type 3 soil or in a trench more than 4 metres deep in type 4 soil is designed and certified as safe by a professional engineer and installed, used, maintained and dismantled in accordance with that design. - (4) An employer or contractor shall ensure that: - (a) shoring is installed and removed in a manner that protects workers from cave-ins and structural collapses and from being struck

[5] General Regulation (N.B. Reg. 91-191)

Page 168

Open source document

Source excerpt

## Support where heavy equipment used near edge 181 (3) Where powered mobile equipment or a mobile crane is used near the edge of an excavation or trench, an employer shall ensure that any shoring, bracing or ca -ging for the excavation or trench is adequate to support the increased pressure. ## Certificate of engineer respecting support 181 (4) An employer shall ensure that shoring, bracing or caging for an excavation or trench is certified as ade -quate by an engineer and shall make the proof of the cer -tification available to an officer on request. 2001-33 ## Entering excavation or trench 182 (1) An employer shall ensure that an employee does not, and no employee shall, enter an excavation or trench 1.2 m or more in depth unless - (a) the walls of the excavation or trench are sup -ported by shoring, bracing or caging, the excavation or trench is cut in solid rock or the excavation or trench is sloped or benched to within 1.2 m of the bot -tom of the excavation or trench with the slope not ex -ceeding 1 m of vertical rise to each 1 m of horizontal run, - (b) subsections 181(2), (3) and (4) have been com -plied with, - (c) loose material that may fall into the excavation or trench has been removed, and - (d) a ladder that extends at least 1 m above the ex -cavation or trench is installed no more than 15 m from where the employee is working or some other safe means of access and egress is provided. - 182 (2) Notwithstanding subsection (1), an employee may enter an excavation 1.2 m or more in depth to install bracing if the employee remains a distance from the face of the excavation equal to or greater than the depth of the excavation. ## Soutènement des parois si utilisation de matériel lourd 181 (3) Lorsqu'un équipement mobile à moteur ou une grue mobile est utilisé près du bord d'une excavation ou d'une tranchée, l'employeur doit s'assurer que tout étayage, tout étrésillonnement ou tout encagemen

Related Q&A

Keep exploring.

Human questionCanada

List best practice in regards to a site orientation that meet compliance to BC, Canada

In British Columbia, construction site orientation should be treated as a documented, site-specific process completed before work begins, especially for young or new workers. At minimum, orientation must cover the worker’s supervisor contact information; worker and employer rights and responsibilities; reporting unsafe

Read the thread
Human questionGeneral

Perform a risk assessment for excavation work

Risk Assessment for Excavation Work 1. Hazard Identification Cave-ins: The most significant hazard in excavation work is the risk of cave-ins, which can occur if the sides of the excavation are not properly supported or sloped [1]. Falling Objects: Loose soil or rocks can fall into the excavation, posing a risk to

Read the thread
Human questionGeneral

Write a toolbox talk on How to work safely on a busy site

Working Safely on a Busy Construction Site ========================================== *Date:** 2026-07-17 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To reinforce safe work practices for a busy construction site by identifying common struck-by, run-over

Read the thread
Human questionGeneral

Trenching

Toolbox Talk: Trenching Safety *Date:** [DATE] *Duration:** [DURATION] minutes *Presenter:** [PRESENTER NAME] *Location:** [LOCATION] Objective To educate workers on the hazards associated with trenching and excavation work, and to provide them with the knowledge and procedures necessary to perform these tasks safely

Read the thread
Discussion thread

Add your experience.

Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.

New contributions are temporarily closed while the moderation queue is configured.

Community answers(0)

No community answers have been approved yet.

Comments on Rosie's answer(0)

No comments have been approved yet.

Ready to put operational safety to work?

Join 400K users across 150K sites already on SALUS.

No commitment · 30-minute personalized walkthrough