Write a risk assessment for Write a risk assessment and a method statement for infrastructure

A person submitted this question to Rosie's free generator. The asker's identity is neither imported nor published.

Rosie's answer

Published by SALUS

A suitable RAMS for infrastructure works should begin with a task-by-task risk assessment and method statement covering the sequence of work, hazards, persons at risk, initial risk rating, controls, residual risk, supervision, competence, permits, emergency arrangements, and inspection requirements. The risk assessment should identify each job or task, the hazards, where they are located, the likelihood of injury, the severity of potential injury, and the PPE needed. A practical approach is to use a job hazard analysis that breaks the work into steps and records hazard type, hazard source, body parts at risk, severity, probability, risk code, and control method. [7] [2] [6]

For risk evaluation, use a severity-versus-probability matrix and assign a risk code to each task step. High-risk activities must not proceed until controls are implemented; medium-risk activities require prompt control measures; low-risk activities may proceed if no other mandatory safeguards are required. This is especially important for excavation, lifting, live traffic interfaces, underground services, and plant movement, where the potential for fatal or severe injury is significant. [1] [1] [1]

Typical hazard identification for infrastructure works should include:

  • Underground and overhead services, including electric, gas, water, telecoms, and confined utility corridors
  • Excavation collapse, falls into excavations, inundation, contaminated ground, and striking buried services
  • Plant and vehicle movement, reversing, blind spots, pedestrian interface, and rollover
  • Lifting operations, suspended loads, crane radius intrusion, unstable ground, and rigging failure
  • Manual handling, hand-arm vibration, noise, dust, silica, fumes, and hazardous substances
  • Work at height, falling objects, unstable edges, and access/egress hazards
  • Public protection risks, including adjacent roads, footpaths, occupied premises, and third-party access
  • Adverse weather, poor visibility, fatigue, lone working, and emergency access constraints

[6] [7] Task-specific controls should follow the hierarchy of controls. First eliminate the hazard where possible, then use engineering controls, work practices, and administrative controls, with PPE as the last layer. The RAMS should clearly state the control method for each hazard and stop the work if the residual risk remains unacceptable. [3] [2] [3]

A safe system of work for infrastructure activities should include:

  • Pre-start planning, utility searches, drawings review, permits, and site-specific briefing
  • Competent supervision and trained operators, slingers, signallers, banksmen, and excavator operators
  • Defined work sequence, exclusion zones, and communication arrangements
  • Inspection of plant, lifting gear, access equipment, and excavation supports before use
  • Segregation of pedestrians and vehicles, controlled access points, and public protection barriers
  • Permit-to-dig, permit-to-lift, hot-work or isolation permits where applicable
  • Monitoring for changing ground, weather, traffic, and service conditions, with authority to stop work
  • Daily briefings, toolbox talks, and review of RAMS when scope or conditions change

[11] [11] PPE requirements for infrastructure works should be selected from the hazard assessment and commonly include:

  • Head protection where there is risk from falling objects, low overhead obstructions, or electrical exposure
  • Eye and face protection for dust, flying particles, cutting, grinding, breaking, drilling, and chemical splash risks
  • High-visibility torso protection for plant and traffic interface areas
  • Hand protection matched to the hazard, such as general work gloves, cut-resistant gloves, chemical-resistant gloves, or insulated gloves
  • Foot protection such as steel toe footwear, puncture-resistant soles, slip-resistant soles, or chemical-resistant boots
  • Hearing protection where noise exposure reaches or exceeds action levels
  • Fall protection where there are unguarded edges or work above lower levels
  • Respiratory protection where dust, silica, fumes, or other airborne contaminants cannot be adequately controlled by other means

[8] [16] [14] [15] [17] [9] [10] [6] For excavation works, the RAMS should require service detection and confirmation before breaking ground, a permit-to-dig system, safe excavation support or battering/benching as appropriate, spoil and plant kept back from edges, safe access and egress, inspection by a competent person, and controls for water ingress, contaminated ground, and atmospheric hazards where relevant. No one should enter an unsupported excavation where collapse is possible, and excavator operations should be controlled with exclusion zones and a trained banksman where visibility is restricted.

For lifting operations, the RAMS should define the lift plan, load weight, radius, crane or lifting appliance capacity, ground bearing capacity, rigging arrangement, exclusion zone, communication method, weather limits, and competent personnel. Lifting accessories should be inspected before use, suspended loads must never pass over people, and the area should be controlled to prevent unauthorized entry. Complex or high-risk lifts should be planned and supervised by an appointed competent person.

For plant and equipment, only suitable and inspected equipment should be used, with operators trained and authorized for the specific machine. Pre-use checks should cover brakes, steering, alarms, lights, guards, attachments, tires or tracks, leaks, and emergency devices. Defective plant should be taken out of service. Reversing should be minimized, and where unavoidable it should be controlled by segregation, cameras or alarms, and a banksman when needed.

Traffic management should be documented in the RAMS and site traffic plan. It should include delivery routes, one-way systems where possible, speed limits, pedestrian walkways, crossing points, signage, barriers, lighting, reversing controls, and arrangements for interface with the public highway. Where works affect live roads or footpaths, use approved temporary traffic management layouts, maintain emergency access, and protect pedestrians with clear segregated routes.

Site safety arrangements should include induction, welfare, housekeeping, lighting, secure storage, environmental controls, first aid, fire points, spill response, and clear reporting lines. Regular inspections are necessary to confirm that controls remain effective and to identify new hazards when equipment, materials, processes, or locations change. [5] [5]

Emergency procedures in the RAMS should cover excavation collapse, service strike, fire, medical emergency, plant collision, lifting incident, hazardous substance exposure, and severe weather. The document should state emergency contacts, site address and access points, rescue arrangements, isolation procedures for utilities and plant, first-aid provision, spill containment, and evacuation or muster arrangements. Workers should be briefed on who raises the alarm, who contacts emergency services, and who controls the scene until help arrives.

In terms of compliance and documentation, the RAMS package should include the risk assessment, method statement, PPE hazard assessment, permits, inspection records, plant certifications, lifting accessory records, training and competence records, induction records, emergency arrangements, and evidence of communication to the workforce. PPE selection must be communicated to affected employees, fitted correctly, used when exposed to hazards, and maintained in safe condition. [12] [4] [13]

A concise RAMS structure for infrastructure works is: scope of works; responsibilities; competence requirements; references and permits; plant, tools, and materials; sequence of operations; hazard identification and risk ratings; control measures by task; PPE; traffic and pedestrian management; excavation controls; lifting controls; environmental controls; emergency procedures; monitoring, inspection, and review; and workforce briefing/sign-off. The assessment should be certified and kept under review whenever the job changes, new equipment or processes are introduced, an accident occurs, or site conditions materially change. [5] [11] [3]

17 source record(s)

Sources used for this answer

[1] Personal Protective Equipment (PPE) Guide

Page 23

Open source document

Source excerpt

# Option 2 <table><tr><th></th><th></th><th colspan="5">Job Hazard Analysis Matrix</th></tr><tr><td colspan="2">Severity of Injury</td><td colspan="5">Probability of an Accident Occurring</td></tr><tr><td>Level</td><td>Description</td><td>A Frequent</td><td>B Several Times</td><td>C Occasional</td><td>D Possible</td><td>E Extremely Improbable</td></tr><tr><td>I</td><td>Fatal or Permanent Disability</td><td>1</td><td>1</td><td>1</td><td></td><td>3</td></tr><tr><td>||</td><td>Severe Illness or Injury</td><td>1</td><td>1</td><td>2</td><td>2233</td><td>3</td></tr><tr><td>III</td><td>Minor Injury or illness</td><td>2</td><td>2</td><td>2-3</td><td></td><td>3</td></tr><tr><td>IV</td><td>No Injury or Illness</td><td>3</td><td>3</td><td>3</td><td></td><td>3</td></tr></table> <table><tr><th colspan="3">Risk Priority</th></tr><tr><td>Code</td><td>Risk Level</td><td>Action Required</td></tr><tr><td>1</td><td>High</td><td>Work activities must be suspended immediately until hazard can be eliminated or controlled or reduced to a lower level.</td></tr><tr><td>2</td><td>Medium</td><td>Job hazards are unacceptable and must be controlled by engineering, administrative, or personal protective equipment methods as soon as possible.</td></tr><tr><td>3</td><td>Low</td><td>No real or significant hazard exists. Controls are not required but may increase the comfort level of employees.</td></tr></table> 3. Take action on the assessment. Depending on the assigned Risk Level/Code (or Risk priority), take the corresponding action according to the table above: β€’ If Risk priority is LOW (3) for a task step β†’ requires no further action. - Note: If you assign a risk code of 3, be sure that there isn't a WISHA standard that requires specific protection be provided. For example: WAC 296-24-[redacted postal code] requires personal protective equipment when using compressed air for cleaning. - If Risk priority is MEDIUM (2) β†’ select and implement appropriate controls. β€’ If Risk priori…

[2] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 8

Open source document

Source excerpt

# Hazard assessment worksheet: Leg protection (cont.) ## PPE required (cont.) OSHA Oregon OSHA Department of Consumer and Business Services # Hazard assessment worksheet: Hand protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards - No hazards requiring hand protection - Harmful or hazardous temperatures - Chemicals that can be absorbed into the skin or cause burns - Energized electrical equipment - Mechanical equipment that can cause bruises, abrasions, cuts, punctures, fractures, or amputations Other hazard: ## PPE required None required - Cut resistant gloves General-purpose work gloves Chemical resistant gloves ............... Insulated gloves Heat and flame resistant gloves Latex or nitrile gloves Electrician's insulated rubber gloves Cotton, leather, or anti-vibration gloves Other PPE: 440-5871 (07/23/COM)

[3] Personal Protective Equipment (PPE) Guide

Page 24

Open source document

Source excerpt

# Option 2 # Job Hazard Analysis for Personal Protective Equipment (PPE) Assessment Job/Task: Location: <table><tr><th>Job/Task Step</th><th>Hazard Type</th><th>Hazard Source</th><th>Body Parts At Risk</th><th>Severity</th><th>Probability</th><th>Risk Code</th><th>Control MethodΒΉ</th></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr></table> (1) Note: Engineering, work practice, and/or administrative hazard controls such as guarding must be used, if feasible, before requiring employees to use personal protective equipment. Certification of Assessment *Name of work place: <empty> *Address: <empty> *Assessment Conducted By: <empty> Title: <empty> *Date(s) of Assessment: <empty> Implementation of Controls Approved By: <empty> Title: <empty> Date: <empty> Page 24 24 24

[4] Personal Protective Equipment (PPE) Guide

Page 38

Open source document

Source excerpt

# SAMPLE PPE POLICIES # Procedures ## A. Hazard Assessment for PPE (Safety Person or designated person), in conjunction with Supervisors, will conduct a walk-through survey of each work area to identify sources of work hazards. Each survey will be documented using the Hazard Assessment Certification Form, which identifies the work area surveyed, the person conducting the survey, findings of potential hazards, and date of the survey. (Safety Person or designated person) will keep the forms in the (Specify exact location, e.g., your company's business files). (Safety Person or designated person) will conduct, review, and update the hazard assessment for PPE whenever β€’ a job changes β€’ new equipment or process is installed β€’ there has been an accident - whenever a supervisor or employee requests it β€’ or at least every year Any new PPE requirements that are developed will be added into (Name of your business)'s written accident prevention program. ## B. Selection of PPE Once the hazards of a workplace have been identified, (Safety Person or designated person) will determine if the hazards can first be eliminated or reduced by methods other than PPE, i.e., methods that do not rely on employee behavior, such as engineering controls (refer to Appendix B - Controlling Hazards). If such methods are not adequate or feasible, then (Safety Person or designated person) will determine the suitability of the PPE presently available; and as necessary, will select new or additional equipment which ensures a level of protection greater than the minimum required to protect our employees from the hazards (refer to Appendix C - Selection of PPE). Care will be taken to recognize the possibility of multiple and simultaneous exposure to a variety of hazards. Adequate protection against the highest level of each of the hazards will be recommended for purchase. All personal protective clothing and equipment will be of safe design and construction for the work to be performed an…

[5] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 9

Open source document

Source excerpt

# Hazard assessment worksheet: Hand protection (cont.) ## PPE required (cont.) OSHA Oregon OSHA Hazard assessment worksheet: Hearing protection Department of Consumer and Business Services Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards <table><tr><th>No hazards requiring hearing protection</th></tr><tr><td>8-hour time-weighted average of 85 decibels or greater</td></tr><tr><td>8.0 hours of exposure greater than 90 dBA</td></tr><tr><td>6.0 hours of exposure greater than 92 dBA</td></tr><tr><td>4.0 hours of exposure greater than 95 dBA</td></tr><tr><td>3.0 hours of exposure greater than 97 dBA</td></tr><tr><td>2.0 hours of exposure greater than 100 dBA</td></tr><tr><td>1.5 hours of exposure greater than 102 dBA</td></tr><tr><td>hours of exposure greater than 105 dBA</td></tr><tr><td>0.5 hours of exposure greater than 110 dBA</td></tr><tr><td>0.25 hours of exposure greater than 115 dBA</td></tr><tr><td>Other hazard:</td></tr></table> ## PPE required None required Ear plugs Ear muffs Other PPE: 440-5871 (07/23/COM)

[6] Personal Protective Equipment Hazard Assessment

Page 4

Open source document

Source excerpt

# What is a PPE hazard assessment? A personal protective equipment (PPE) hazard assessment is an evaluation of your workplace that helps you determine what hazards your employees are exposed to and what PPE they need to protect themselves. A hazard assessment should include: - The jobs (or tasks) your employees do - The hazards your employees are exposed to β€’ Where the hazards are located - The likelihood those hazards could injure your employees - The severity of a potential injury β€’ The types of PPE necessary to protect your employees from those hazards ## Why should you do a PPE hazard assessment? There are three reasons: 1. A hazard assessment will help you find hazards at your workplace. 2. A hazard assessment will help you determine what personal protective equipment your employees need for protection. 3. Oregon OSHA's rules require you do one. 2

[7] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 6

Open source document

Source excerpt

# Hazard assessment worksheet: Head protection (cont.) ## Potential hazards (cont.) OSHA Oregon OSHA Department of Consumer and Business Services # Hazard assessment worksheet: Foot protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards - No hazards requiring foot protection - Heavy objects such as barrels or tools that might roll onto or fall on a worker's feet - Sharp objects such as nails or spikes that could pierce the soles or uppers of ordinary shoes - Molten metal Hot, wet, or slippery surfaces Energized electrical equipment Other hazard: ## PPE required None required Steel toe shoes Boots or shoes metatarsal guards Slip resistant soles Puncture resistant soles Chemical resistant boots Insulated boots or shoes Other PPE: 440-5871 (07/23/COM)

[8] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 3

Open source document

Source excerpt

## PPE required (cont.) OSHA Oregon OSHA Department of Consumer and Business Services # Hazard assessment worksheet: Torso protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards - No hazards requiring torso protection - Extreme temperatures Hot splashes from molten metal and other hot liquids - Impacts from tools, machinery, and materials Hazardous chemicals lonizing radiation Other hazard: ## PPE required None required Chemical resistant coveralls Cut-resistant sleeves, wristlets Flame-resistant jacket Flame-resistant pants High visibility garment Insulated jacket, hood Lab coat or apron Static control coats or coveralls Other PPE: 440-5871 (07/23/COM)

[9] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 4

Open source document

Source excerpt

# Hazard assessment worksheet: Torso protection (cont.) ## PPE required (cont.) OSHA Oregon OSHA Department of Consumer and Business Services # Hazard assessment worksheet: Eye and face protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards - No hazards requiring eye and face protection - Dust, dirt, metal, or wood chips from chipping, grinding, sawing, hammering, and from power tools - Chemical splashes from corrosive substances, hot liquids, and solvents - Objects such as tree limbs, chains, tools, and ropes that swing into the eyes or face - Radiant energy from welding and harmful rays from lasers or other radiant light - Other hazard: ## PPE required - None required - Chemical goggles Face shield - Chemical splash goggles Glasses or goggles with face shield Impact goggles Welding hood Welding helmet Safety glasses with side shields ............... Safety goggles with face shield Welding goggles Other PPE: 440-5871 (07/23/COM)

[10] Personal Protective Equipment Hazard Assessment

Page 5

Open source document

Source excerpt

# What are Oregon OSHA's requirements for PPE hazard assessments? If you are a general industry, construction, or agricultural employer you must determine if your workplace has hazards you cannot eliminate or control without PPE. If there are such hazards, you must: β€’ Select the PPE that protects your employees from the hazards β€’ Communicate your selection decisions to each affected employee β€’ Ensure the PPE fits each employee β€’ Require your employees to use their PPE when they are exposed to the hazards General industry employers must also prepare a document that says they have done the hazard assessment. The document must include: β€’ A heading that says the document is a "certification" of the hazard assessment β€’ The name of the workplace evaluated β€’ The name of the person certifying the hazard assessment was completed β€’ The date of the hazard assessment ## Oregon OSHA's hazard assessment rules β€’ General industry: [redacted phone](1), Hazard assessment and equipment selection. Appendix B to Subdivision 2/1 has guidelines for conducting a hazard assessment. β€’ Construction: [redacted phone](1), Hazard assessment and equipment selection. Appendix B to Subdivision 2/1 has guidelines for conducting a hazard assessment. β€’ Agriculture: [redacted phone](2), Hazard assessment and protective equipment selection. Appendix A to Subdivision 4/1 has a sample hazard assessment form. 3

[11] Personal Protective Equipment (PPE) Guide

Page 3

Open source document

Source excerpt

# TABLE OF CONTENTS (If viewing this pdf document on the computer, you can place the cursor over the section headings below until a hand appears and then click. You can also use the Adobe Acrobat Navigation Pane to jump directly to the sections.) <table><tr><th></th><th>How To Use This Guide...</th><th>4</th></tr><tr><td>A.</td><td>Introduction</td><td>.6</td></tr><tr><td>B.</td><td>What you are required to do.</td><td>8</td></tr><tr><td></td><td>1. Do a Hazard Assessment for PPE and document it</td><td>8</td></tr><tr><td></td><td>2. Select and provide appropriate PPE to your employees..</td><td>10</td></tr><tr><td></td><td>3. Provide training to your employees and document it.</td><td>11</td></tr><tr><td></td><td>4. Make sure your employees use their PPE properly.</td><td>12</td></tr><tr><td></td><td>5. Make sure PPE is in safe and good condition</td><td>12</td></tr><tr><td>C.</td><td>Resources</td><td>.14</td></tr><tr><td></td><td>Tools/Forms: Checklists and forms you can use to help you</td><td></td></tr><tr><td></td><td>comply with PPE requirements.</td><td>15</td></tr><tr><td></td><td>Guidelines for complying with PPE requirements.</td><td>5672 16</td></tr><tr><td></td><td>Hazard Assessment For PPE.</td><td>17</td></tr><tr><td></td><td>Job Hazard Analysis Assessment for PPE.</td><td>21</td></tr><tr><td></td><td>- Additional Guidelines for Conducting a Job Hazard Analysis (JHA) Assessment for PPE...</td><td>.25</td></tr><tr><td></td><td>Personal Protective Equipment Training Certification Form</td><td></td></tr><tr><td></td><td>Personal Protective Equipment Training Quiz.</td><td></td></tr><tr><td></td><td>Sample PPE Policies</td><td></td></tr><tr><td></td><td>Recognizing and Controlling Hazards</td><td></td></tr><tr><td></td><td>What is a hazard?.</td><td>35</td></tr><tr><td></td><td>How do you control hazards?</td><td>38</td></tr><tr><td></td><td>Engineering Controls.</td><td>38</td></tr><tr><td></td><td>- Work Practice Controls</td><td>39</td></tr><tr><td><…

[12] Personal Protective Equipment Hazard Assessment

Page 6

Open source document

Source excerpt

# What types of PPE may be necessary? Your hazard assessment should determine if your employees need any of the following types of PPE: - Eye and face protection β—† Fall protection - Foot protection β€’ Hand/general skin protection - Head protection β€’ Hearing protection β€’ Leg protection ● Personal floatation device β€’ Respiratory protection β€’ Torso/general body protection ## How to do a PPE hazard assessment ## Do a baseline survey to identify workplace hazards A baseline survey is a thorough evaluation of your entire workplace - including work processes, tasks, and equipment - that identifies safety and health hazards. A complete survey will tell you what the hazards are, where they are, and how severe a potential injury could be. ## Suggestions: Use safety data sheets (SDS) to identify chemical hazards. A safety data sheet has detailed information about a hazardous chemical's health effects, its physical and chemical characteristics, and safe handling practices. Review equipment owner and operator manuals to determine the manufacturer's safety warnings and recommended PPE. Conduct a job-hazard analysis (JHA) - a method of identifying, assessing, and controlling hazards associated with specific jobs. A JHA breaks down a job into tasks. You evaluate each task to determine if there is a safer way to do it. A job-hazard analysis works well for jobs with difficult-to-control hazards and jobs with histories of accidents or near misses. JHAS for complex jobs can take a considerable amount of time and expertise to develop. You may want to have a safety professional help you. Have an experienced safety professional survey your workplace with you. 4

[13] Personal Protective Equipment Hazard Assessment

Page 8

Open source document

Source excerpt

# Evaluate your employees' exposures to each hazard identified in the baseline survey (cont.) ## Document your hazard assessment For each job assessed, documentation must include the following information: - A heading saying the document is a "certification" of the hazard assessment β€’ The name of the workplace evaluated - The name of the person certifying the hazard assessment was completed PPE hazard assessment certification Workplace evaluated: Person certifying the evaluation: Hazard assessment date: β€’ The date of each hazard assessment Use the PPE hazard assessment and certification form on our website to conduct your own hazard assessment. Construction industry and agricultural employers do not have to document their hazard assessments, but must tell each exposed employee about their PPE selection decisions and meet other rule requirements. ## Do regular workplace inspections Regular inspections tell you whether you have eliminated or controlled existing hazards, and help you identify new hazards. Quarterly inspections by employees trained in hazard recognition are a good way to get the job done. Look for new hazards whenever you change equipment, materials, or work processes. Determine what hazards could result from the changes and how to control them. If your business works at multiple sites, you may need to do a hazard assessment at each site. 6

[14] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 2

Open source document

Source excerpt

## PPE required at this workplace includes (check all that apply): (cont.) OSHA Oregon OSHA Department of Consumer and Business Services Hazard assessment worksheet: Fall protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards No hazards requiring fall protection Unguarded surfaces more than 6 or 4 feet above a lower level or any height above dangerous equipment Other hazard: ## PPE required None required Personal fall arrest system Personal fall restraint system Other PPE: 440-5871 (07/23/COM)

[15] Personal Protective Equipment (PPE) Guide

Page 28

Open source document

Source excerpt

# Option 2 A high risk priority means that there is a reasonable to high probability that an employee will be killed or permanently disabled doing this task step and/or a high probability that the employee will suffer severe illness or injury! 4. Select PPE: Try to reduce employee exposure by first implementing effective controls that do not primarily rely on individual employee behavior (such as using PPE). Follow the "Hierarchy of Controls" (p. 38). a. For each hazard you identified, ask the question: "Can we change the way this job is done to eliminate or reduce this hazard?" Ideas might include combining steps, changing the sequence, a different tool, a change in the workstation, ventilation etc. The employees who do this job may have some good practical ideas. b. If none of these will work, what personal protective equipment (PPE) is needed? If PPE is needed, it must be appropriately matched to the hazard to provide effective protection against the hazard. c. Write down your solution in the Control Method column opposite the hazard. If you still aren't satisfied that the hazard is under control, you may need to consider not doing this job or doing it less often. 5. Certify the hazard assessment: Make sure you sign and fill in the required information (indicated by *) at the bottom of the form for proper documentation of the hazard assessment. The following pages show two examples of completed JHA hazard assessments for PPE. 28

[16] Personal Protective Equipment (PPE) Guide

Page 35

Open source document

Source excerpt

# SAMPLE PPE POLICIES # Introduction The purpose of the Personal Protective Equipment Policies is to protect the employees of (Name of your business) from exposure to work place hazards and the risk of injury through the use of personal protective equipment (PPE). PPE is not a substitute for more effective control methods and its use will be considered only when other means of protection against hazards are not adequate or feasible. It will be used in conjunction with other controls unless no other means of hazard control exist. Personal protective equipment will be provided, used, and maintained when it has been determined that its use is required to ensure the safety and health of our employees and that such use will lessen the likelihood of occupational injury and/or illness. This section addresses general PPE requirements, including eye and face, head, foot and leg, hand and arm, body (torso) protection, and protection from drowning. Separate programs exist for respiratory protection and hearing protection as the need for participation in these programs is established through industrial hygiene monitoring. (List other programs or policies requiring PPE, such as Hearing Protection, Respiratory Protection, Fall Protection, etc., that you may have at your work place) are also addressed in (State the section or location in your Accident Prevention Program where they are found) The (Name of your business) Personal Protective Equipment Policies includes: - Responsibilities of supervisors and employees β€’ Hazard assessment and PPE selection - Employee training - Cleaning and Maintenance of PPE Sample Policies-2

[17] Personal Protective Equipment (PPE) Hazard Assessment Tool

Page 5

Open source document

Source excerpt

# Hazard assessment worksheet: Eye and face protection (cont.) ## PPE required (cont.) OSHA Oregon OSHA Department of Consumer and Business Services # Hazard assessment worksheet: Head protection Salem Central Office [redacted street address]. NE Salem, OR [redacted postal code] Phone: [redacted phone] Toll-free: [redacted phone] osha.oregon.gov Work task: Date ## Potential hazards No hazards requiring head protection Overhead objects that could fall Exposed pipes or beams (less than 6.5 feet overhead) Energized electrical equipment Other hazard: <table><tr><th>PPE required</th></tr><tr><td>None required</td></tr><tr><td>Impact Type I</td></tr><tr><td>Impact Type II</td></tr><tr><td>Electrical Class G (general)</td></tr><tr><td>Electrical Class E (electrical)</td></tr><tr><td>Electrical Class C (conductive)</td></tr><tr><td>Other PPE:</td></tr></table> 440-5871 (07/23/COM)

Related Q&A

Keep exploring.

Human questionGeneral

Give me a audit for a construction site

Safety Audit Checklist for Construction Site Hazard Identification and Risk Assessment ====================================================================================== This checklist provides a framework for conducting safety audits on construction sites, focusing on hazard identification and risk assessment. It

Read the thread
Human questionGeneral

rail construction

Rail Construction and Maintenance Safety ======================================== Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This safe work procedure (SWP) outlines the safety requirements for all rail construction and maintenance

Read the thread
Human questionGeneral

Generate HS Manual for Construction Project

Construction Project Health and Safety Manual ============================================= This manual outlines the health and safety requirements for the construction project. It details critical safety procedures, risk assessments, emergency response plans, and compliance measures to ensure a safe working

Read the thread
Human questionGeneral

I need a SWP for concrete pouring and forming

Concrete Pouring and Formwork Installation Safe Work Procedure ============================================================== Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This Safe Work Procedure (SWP) outlines the safety