checklist for shutting down a jobsite due to ICE raid
A person submitted this question to Rosie's free generator. The asker's identity is neither imported nor published.
Rosie's answer
Published by SALUSHere is a checklist for shutting down a jobsite due to an ICE raid. This checklist is designed to ensure a safe and orderly shutdown, protecting both personnel and equipment.
Jobsite Shutdown Checklist - ICE Raid
I. Immediate Actions
- [ ] Alert all personnel: Use established communication channels (e.g., radio, text message) to inform all workers of the immediate shutdown and the reason [1].
- [ ] Initiate Evacuation: Direct all personnel to a designated safe area or off-site location, following pre-established evacuation routes [1].
- [ ] Account for all Personnel: Take a roll call to ensure all employees are accounted for. Report any missing individuals to the designated emergency contact [1].
II. Equipment and Site Security
- [ ] Secure Equipment:
- [ ] Heavy Equipment: Lower all attachments to the ground, engage parking brakes, and turn off engines [2], [3].
- [ ] Power Tools: Disconnect from power sources and store securely [4], [5].
- [ ] Hazardous Materials: Ensure all hazardous materials are properly stored and secured to prevent spills or leaks [4], [5].
- [ ] Lockout/Tagout: Apply lockout/tagout procedures to all equipment to prevent accidental start-up [4], [5].
- [ ] Perimeter Security: Secure the site perimeter to prevent unauthorized access. This may include closing gates, erecting temporary fencing, or other appropriate measures [1].
III. Utilities and Services
- [ ] Electrical: Shut down all non-essential electrical power, following proper shutdown procedures [4], [5].
- [ ] Water: Turn off the main water supply to prevent potential leaks or flooding [6].
- [ ] Gas: Shut off the main gas supply, if applicable, following established safety protocols [4], [5].
IV. Documentation and Communication
- [ ] Incident Reporting: Document the event, including the time of the raid, actions taken, and any relevant observations [7].
- [ ] Notify Authorities: Contact local authorities and company management to report the situation and coordinate further actions [1].
- [ ] Communicate with Clients/Stakeholders: Inform clients, subcontractors, and other relevant stakeholders about the jobsite shutdown and expected duration [8], [7].
V. Post-Shutdown Actions
- [ ] Site Inspection: After the all-clear is given, conduct a thorough site inspection to assess any damage or security breaches [9].
- [ ] Equipment Inspection: Inspect all equipment before restarting to ensure it is safe to operate [2], [3].
- [ ] Communicate Restart Plan: Develop and communicate a clear plan for restarting operations, including any necessary safety briefings or training [5].
Notes:
- This checklist is a general guideline and may need to be adapted based on the specific circumstances of the jobsite.
- Ensure all personnel are trained on emergency shutdown procedures.
- Regularly review and update this checklist to reflect changes in site conditions or regulations.
Corrective Actions:
- List any corrective actions needed as a result of this shutdown:
- ________________________________________________________________________
- ________________________________________________________________________
- ________________________________________________________________________
Checklist Completed By:
Name: ____________________________
Title: ____________________________
Date: ____________________________
Signature: ________________________
Sources used for this answer
[1] Rules for the Administration of the Oregon Safe Employment Act (General Occupational Safety and Health, Division 2, OSHA Oregon)
Page 974
Open source documentSource excerpt
Oregon Occupational Safety and Health Division - (1) Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. - (2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. - (3) Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). - (4) Lockout or tagout device application. - (i) Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees. - (ii) Lockout devices, where used, shall be affixed in a manner to that will hold the energy isolating devices in a 'safe' or 'off' position. - (iii) Tagout devices, where used, shall be affixed in such a manner as will clearly indicate that the operation or movement of energy isolating devices from the 'safe' or 'off' position is prohibited. - (A) Where tagout devices are used with energy isolating devices designed with the capability of being locked, the tag attachment shall be fastened at the same point at which the lock would have been attached. - (B) Where a tag cannot be affixed directly to the energy isolating device, the tag shall be located as close as safely possible to the device, in a position that will be immediately obvious to anyone attempting to operate the device. - (5) Stored energy. - (i) Following the application of lockout or tagout devices to energy isolating devices, all potentially hazardous stored or residual energy shall …
[2] HIOSH Construction Standards: Occupational Safety and Health (12-8-3)
Page 9
Open source documentSource excerpt
responsibility for occupational safety and health for the subcontractor's operation. That is, the subcontractor accepts responsibility for the subcontractor's portion of the work while the prime contractor assumes the entire responsibility for the project. - (3) Where joint responsibility exists, both the prime and subcontractors are subject to the enforcement provisions of the law; therefore, because of possible overlapping responsibilities, both may be cited for violations. - (g) All safety devices and safeguards in use shall be kept sound and operable. - (h) Any employee having knowledge of the existence of any unsafe device, practice, operation, safeguard, equipment, or condition shall promptly report it to the supervisor or person in charge. A supervisor or person in charge to whose attention the existence of any unsafe device, practice, operation, safeguard, equipment, or condition is called shall take immediate steps to correct the unsafe condition or practice. [Eff 7/12/82; am 9/27/84; am 8/5/88; am 9/21/96; am and comp 10/27/18] (Auth: HRS §396-4) (Imp: HRS §396-4) §12-110-3 Safety and health inspections. (a) The general contractor of every construction or demolition project on which employees are engaged shall arrange to have inspections made during the period of the project for the purpose of assuring compliance with the Hawaii Occupational Safety and Health Law. Where there is no general contractor, the owner shall be responsible or shall designate one particular contractor to be responsible to perform the necessary safety inspections. - (b) Inspections shall be conducted with sufficient quality, frequency, and scope to identify recognized hazards and ensure their correction in
[3] Rules for the Administration of the Oregon Safe Employment Act (General Occupational Safety and Health, Division 2, OSHA Oregon)
Page 675
Open source documentSource excerpt
Oregon Occupational Safety and Health Division Oregon Administrative Rules - (iv) Safe distances and places of refuge. - (v) Site security and control. - (vi) Evacuation routes and procedures. - (vii) Decontamination procedures which are not covered by the site safety and health plan. - (viii) Emergency medical treatment and first aid. - (ix) Emergency alerting and response procedures. - (x) Critique of response and follow-up. - (xi) PPE and emergency equipment. - (3) Procedures for handling emergency incidents. - (i) In addition to the elements for the emergency response plan required in paragraph (l)(2) of this section, the following elements shall be included for emergency response plans: - (A) Site topography, layout, and prevailing weather conditions. - (B) Procedures for reporting incidents to local, state, and federal governmental agencies. - (ii) The emergency response plan shall be a separate section of the Site Safety and Health Plan. - (iii) The emergency response plan shall be compatible and integrated with the disaster, fire and/or emergency response plans of local, state, and federal agencies. - (iv) The emergency response plan shall be rehearsed regularly as part of the overall training program for site operations. - (v) The site emergency response plan shall be reviewed periodically and, as necessary, be amended to keep it current with new or changing site conditions or information. - (vi) An employee alarm system shall be installed in accordance with 29 CFR 1910.165 to notify employees of an emergency situation; to stop work activities if necessary; to lower background noise in order to speed communication; and to begin emergency procedures. AO 3-2019 Division 2
[4] UOSH Field Operations Manual
Page 205
Open source documentSource excerpt
## 4. Enforcement In the event of violations, citations shall be recommended and civil assessments derived in accordance with procedures set forth in Chapters 4, 5 and 6. ## C. Employer Workplace Inspections of employers in the construction industry are not easily separable into distinct establishments. The establishment is generally the site where the construction is being performed (e.g., the building site, the dam site). Where the construction site extends over a large geographical area (e.g., road construction), the entire job will be considered a single worksite. In cases when such large geographical areas overlap between states, only operations of the employer within the State of Utah will be considered as the worksite of the employer for UOSH inspection purposes. In such cases, the Director or designee may consult with the applicable Federal or other State Plan OSHA Office and refer potential safety and/or health hazards if warranted. For instructions regarding multi-employer worksites, see Chapter 12, Section I. ## D. Advance Notice ## 1. General The same general policies and procedures on advance notice set forth in Chapter 3 are applicable to construction inspections. Thus, in general, advance notice will be given only where it will enhance the effectiveness of the inspection. ## 2. Authorized When advance notice is authorized, the CSHO shall contact the general contractor's office by telephone. If there is more than one general contractor (e.g., if two or more general contractors have formed a joint venture for purposes of the job in question), the CSHO shall attempt to ascertain the identity of all such general contractors and contact each of them. The general contractor(s) shall be told to advise all subcontractors working on the job that the inspection will take place. The general contractor shall also be asked to advise the labor organizations representing employees and to instruct each subcontractor to take similar action, in accorda…
[5] Nevada Operations Manual (Nevada OSHA)
Page 63
Open source documentSource excerpt
- of the abatement measures taken. This information may alternately be included in the narrative of the investigative file. - B. In the event that any item has not been abated, complete documentation shall be included on a Violation Worksheet. - 4. Follow-Up Files - Follow-up inspection reports shall be included with the original (parent) case file. ## b. CONSTRUCTION INSPECTIONS - 1. Standards Applicability - The standards published as 29 CFR Part 1926 have been adopted as occupational safety and health standards under NRS 618.295(8) and §1910.12. They shall apply to every employment and place of employment of every employee engaged in construction work, including non-contract construction. - 2. Definition - The term "construction work" as defined by §1926.32(g) means work for construction, alteration, and/or repair, including painting and decorating. These terms are also discussed in §1926.13. If any question arises, as to whether an activity is construction or not, the Supervisor, DM, or CAO shall be consulted. ## 3. Employer Worksite - A. Inspections of employers in the construction industry are not easily separable into distinct worksites. The worksite is generally the site where the construction is being performed (i.e., the building site, the dam site). Where the construction site extends over a large geographical (i.e., road, building), the entire job will be considered a single worksite. In cases when such large geographical areas overlap between District Offices, generally only operations of the employer within the jurisdiction of any District Office will be considered as the worksite of the employer. - B. When a construction worksite extends beyond a single District Office and the CSHO believes that the inspection should be extended, the affected DMs shall consult with each other and take appropriate action. ## 4. Upon Entering the Workplace - A. CSHOs shall ascertain whether there is a representative of a Federal contracting agency at the worksite.…
[6] Kobelco SK235SR-2, SK235SRLC-2 Operation Manual
Page 57
Open source documentSource excerpt
## 1.9 END OF WORK SHIFT SAFETY Perform all of the following procedures after each shift is complete to insure the machine it in optimal operating condition for the next shift or job site. - 1. Move the machine to a firm, level surface. - 2. Lower attachment to the ground. - 3. Refill fuel tank to full mark to reduce air volume and condensation (moisture). This will decrease the possibility of freezing in the fuel tank rusting due to moisture and other problems associated with start up and operation. - 4. Close and secure all windows in place to prevent water or moisture reaching the electrical components of the machine. - 5. Thoroughly clean and inspect the machine. Perform lubrication maintenance and repair or replace any problem areas found before restarting the machine. - 6. If performing the machine storage in cold climates, it may be necessary to remove the batteries from the machine and store in a warm well ventilated area. Install the batteries in the machine before next start up. This will help prevent premature battery deterioration. - 7. Remove key from key switch and lock all doors and access panels. END OF WORK SHIFT SAFETY <!-- image --> 1
[7] Occupational Safety and Health Standards (OSHA 29 CFR 1910)
Page 120
Open source documentSource excerpt
## 29 CFR 1910 (OSHA) - (A) Retraining shall be provided for all authorized and affected employees whenever there is a change in their job assignments, a change in machines, equipment or processes that present a new hazard, or when there is a change in the energy control procedures. - (B) Additional retraining shall also be conducted whenever a periodic inspection under paragraph (c)(6) of this section reveals, or whenever the employer has reason to believe, that there are deviations from or inadequacies in the employee's knowledge or use of the energy control procedures. - (C) The retraining shall reestablish employee proficiency and introduce new or revised control methods and procedures, as necessary. - (iv) The employer shall certify that employee training has been accomplished and is being kept up to date. The certification shall contain each employee's name and dates of training. - (8) Energy isolation. Lockout or tagout shall be performed only bythe authorized employees who are performing the servicing or maintenance. - (9) Notification of employees. Affected employees shall be notified by the employer or authorized employee of the application and removal of lockout devices or tagout devices. Notification shall be given before the controls are applied, and after they are removed from the machine or equipment. - (d) Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: - (1) Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. - (2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipme…
[8] Rules for the Administration of the Oregon Safe Employment Act (General Occupational Safety and Health, Division 2, OSHA Oregon)
Page 676
Open source documentSource excerpt
Division 2 AO 3-2019 Oregon Administrative Rules Oregon Occupational Safety and Health Division - (vii) Based upon the information available at time of the emergency, the employer shall evaluate the incident and the site response capabilities and proceed with the appropriate steps to implement the site emergency response plan. (m) Illumination. Areas accessible to employees shall be lighted to not less than the minimum illumination intensities listed in the following Table H-120.1 while any work is in progress: Table H-36 - Minimum Illumination Intensities in Foot-Candles - (n) Sanitation at temporary workplaces. - (1) Potable water. - (i) An adequate supply of potable water shall be provided on the site. - (ii) Portable containers used to dispense drinking water shall be capable of being tightly closed, and equipped with a tap. Water shall not be dipped from containers. - (iii) Any container used to distribute drinking water shall be clearly marked as to the nature of its contents and not used for any other purpose.
[9] Kobelco SK330-10, SK250LC-10 Operation Manual
Page 58
Open source documentSource excerpt
[ ## 1.5 AT THE END OF EACH SHIFT Always make sure the machine is secure and ready to be used for the next shift or moved to another job site. - 1. Park the machine on a firm, level surface. - 2. Lower attachment to the ground. - 3. Pull the pilot control shut-off lever. - 4. Close and secure all windows in place to prevent water or moisture from damaging any electrical components. - 5. Remove the key from the key switch and lock all doors and access panels. - 6. Refill the fuel tank to the full mark to reduce air volume and condensation (moisture). - This will decrease the possibility of freezing in the - fuel tank, rusting due to moisture and other potential issues. - 7. Thoroughly clean and inspect the machine. If any issues are found, always lubricate, repair, or replace any machine parts and systems prior to restarting the machine. - 8. If the machine is stored in cold climates, it may be necessary to remove the batteries from the machine and store them in a warm, well ventilated area. Re-install the batteries before the next start up. This helps prevent premature battery deterioration. <!-- image -->
Keep exploring.
Office work
Office work safety for administrative and desk-based tasks should be managed through a basic workplace health and safety program that identifies hazards, applies controls, trains staff, and reviews incidents. Key office hazards include ergonomic strain, poor lighting or air quality, repetitive work, manual handling
Read the threadWrite a risk assessment for am a safety officer at TPPL(Tanga Pharmaceutical and Plastics Limited in Tanga Duga Industrial Area Plot 1-8,…
Occupational Health and Safety Risk Assessment for Cosmetics and Plastics Manufacturing Facility ================================================================================================ *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW
Read the threadcreate a 1 or 2 page toolbox talk safety meeting around the topic of fire awareness & hot work
Fire Prevention and Safe Hot Work Practices =========================================== *Date:** 2026-02-09 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand fire hazards associated with hot work and implement preventive measures to protect personnel and
Read the threadfor a site attendance, what questions should be asked?
During a site attendance or site visit, the key safety objective is to confirm that hazards have been identified, risks assessed, and effective controls implemented before and during the work. A strong site visit should test whether the work is planned, supervised, communicated, and carried out in compliance with the
Read the threadCreate a job hazard assessment for drywall installation
Drywall Installation Job Hazard Analysis ======================================== *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This risk assessment covers all activities related to drywall installation, including but
Read the threadConstruction site
Construction Site Safety Regulations and Hazard Prevention ========================================================== *Date:** 2025-09-10 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To reinforce understanding of construction site safety regulations and promote
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.