Published by SALUSElevator Access and Maintenance Risk Assessment ===============================================
Assessment Date: \[DATE]
Assessor: \[ASSESSOR NAME]
Department/Area: \[DEPARTMENT/AREA]
Review Date: \[REVIEW DATE]
1\. Assessment Scope
This risk assessment covers all activities related to elevator car control, hoistway, and pit access procedures performed by elevator personnel. It includes inspection, maintenance, repair, and modernization activities within the elevator shaft, car, and pit. Excluded are elevator installation and dismantling activities, which require a separate risk assessment.
2\. Risk Assessment Methodology
This risk assessment employs a 5x5 risk matrix to determine risk ratings. The hierarchy of controls is applied to identify and implement appropriate control measures, starting with elimination and substitution, followed by engineering controls, administrative controls, and finally, personal protective equipment (PPE).
3\. Risk Matrix Reference
The following matrix is used to evaluate risk levels based on likelihood and severity:
| Likelihood |
|---|
| Rare | Unlikely | Possible | Likely | Almost Certain | | Severity | Catastrophic | Low | Low | Medium | Medium | High | | Major | Low | Medium | Medium | High | Extreme | | Moderate | Medium | Medium | High | Extreme | Extreme | | Minor | Medium | High | Extreme | Extreme | Extreme | | Negligible | High | Extreme | Extreme | Extreme | Extreme |
4\. Hazard Identification and Risk Evaluation
1\. Falls from height while working in the hoistway or pit
Potential Consequences: Serious injuries or fatalities due to falls from unguarded openings or heights.
Affected Persons: Elevator technicians, inspectors, and contractors
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Major | High |
Control Measures
- Ensure proper lighting in the hoistway and pit.
- Use a safety harness with a self-retracting lifeline (SRL) when working at heights.
- Install temporary guardrails or barriers around open hoistway entrances.
- Implement a 'no work alone' policy or provide a safety watch.
- Conduct regular inspections of fall protection equipment.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Major | Medium |
2\. Electrical shock or electrocution during maintenance or repair work
Potential Consequences: Severe burns, cardiac arrest, or death due to contact with live electrical components.
Affected Persons: Elevator technicians, maintenance personnel
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Catastrophic | High |
Control Measures
- Implement a comprehensive Lockout/Tagout (LOTO) program.
- Verify isolation of electrical and mechanical systems before commencing work.
- Use multi-lock hasps to ensure all workers are protected.
- Train all personnel on LOTO procedures and responsibilities.
- Regularly audit LOTO procedures to ensure effectiveness.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Major | Medium |
3\. Confined space hazards (oxygen deficiency, toxic gases) in the elevator pit
Potential Consequences: Asphyxiation, poisoning, or death due to hazardous atmospheric conditions.
Affected Persons: Elevator technicians, rescue personnel
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Major | Medium |
Control Measures
- Implement a permit-required confined space entry program.
- Conduct atmospheric testing before entry to identify hazards (oxygen deficiency, toxic gases).
- Provide adequate ventilation and continuous air monitoring.
- Ensure a trained attendant is present outside the confined space.
- Develop and practice rescue procedures and provide necessary rescue equipment.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Rare | Major | Low |
4\. Struck by falling objects (tools, equipment) in the hoistway
Potential Consequences: Head injuries, lacerations, or fractures due to falling tools or equipment.
Affected Persons: Elevator technicians, other workers in the vicinity
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Moderate | Medium |
Control Measures
- Ensure proper use of personal protective equipment (PPE), including hard hats and safety glasses.
- Implement a tool tethering program to prevent dropped objects.
- Use barriers and signage to restrict access to the area below the work zone.
- Conduct regular inspections of tools and equipment.
- Provide training on dropped object prevention.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Unlikely | Moderate | Low |
5\. Musculoskeletal injuries due to heavy lifting or awkward postures
Potential Consequences: Strains, sprains, or back injuries due to manual handling of heavy elevator components.
Affected Persons: Elevator technicians
Initial Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Likely | Moderate | Medium |
Control Measures
- Provide ergonomic training on proper lifting techniques.
- Use mechanical aids (e.g., dollies, hand trucks) to move heavy components.
- Implement a 'team lift' policy for heavy or awkward loads.
- Ensure adequate lighting and clear pathways to prevent slips and trips.
- Encourage regular breaks and stretching exercises.
Residual Risk Assessment
| Likelihood | Severity | Risk Rating |
|---|---|---|
| Possible | Moderate | Low |
5\. General Control Measures
- All personnel must wear approved head gear.
Ensure hard hats meet ANSI Z89\.1 standards. [1] [2] [3] [4] [5]
- Regular safety meetings and toolbox talks to discuss potential hazards and safe work practices.
Conduct meetings weekly or before critical tasks.
- Maintain a clean and organized work environment to prevent trips and falls.
Regular housekeeping and waste disposal.
- Ensure all personnel are trained and competent in their assigned tasks.
Provide documented training and competency assessments.
- Provide and enforce the use of appropriate personal protective equipment (PPE).
PPE includes safety glasses, gloves, and appropriate footwear.
6\. Emergency Preparedness
- Establish emergency communication protocols (e.g., two-way radios, cell phones).
- Provide first aid kits and ensure trained first aiders are available on site.
- Develop and practice emergency evacuation procedures for the hoistway and pit.
- Ensure emergency lighting is available in case of power failure.
- Coordinate with local emergency services (fire department, paramedics) for rescue plans.
7\. Training Requirements
- Fall Protection Training: Comprehensive training on fall protection systems, including proper use of harnesses, lanyards, and anchor points.
- Lockout/Tagout (LOTO) Training: Detailed instruction on lockout/tagout procedures, including energy isolation and verification.
- Confined Space Entry Training: Training on confined space entry procedures, atmospheric testing, and rescue techniques.
- Ergonomics and Safe Lifting Training: Training on safe lifting techniques and the use of mechanical aids to prevent musculoskeletal injuries.
- Hazard Communication (HazCom) Training: Training on hazard communication, including SDS review and chemical handling procedures.
8\. Monitoring and Review
Review Frequency: Annually, and after any incident or near miss
| Monitoring Type | Frequency | Responsible Party | Description |
|---|---|---|---|
| Regular Inspection | Monthly | Safety Officer | Regular inspections of fall protection equipment (harnesses, lanyards, SRLs) for damage or defects. |
| Audit | Quarterly | Safety Manager | Periodic audits of lockout/tagout procedures to ensure compliance and effectiveness. |
| Performance Indicator | Continuous | Confined Space Attendant | Continuous air monitoring in the elevator pit during confined space entry. |
| Performance Indicator | Monthly | Safety Committee | Review of incident reports and near-miss investigations to identify trends and areas for improvement. |
| Regular Inspection | Weekly | Supervisor | Observation of work practices to ensure adherence to safe procedures and use of PPE. |
9\. Special Circumstances
- Adverse weather conditions (e.g., high winds, rain) may increase the risk of falls and electrical hazards.
- Night work may reduce visibility and increase the risk of trips and falls.
- Lone work in the hoistway or pit may delay emergency response in case of an incident.
Approval and Sign-off
This risk assessment has been reviewed and approved by:
Assessor: _________________________ Date: __________
Manager/Supervisor: _________________________ Date: __________
Safety Representative: _________________________ Date: __________
This risk assessment must be reviewed annually, and after any incident or near miss or when significant changes occur.
Safety powered by SALUS
Sources used for this answer
[1] JLG - Boom Lifts : T350, T500J - Operation (PN 3121197)
Page 20
Open source documentSource excerpt
# SECTION 1 - SAFETY (cont.) ## Tipping Hazards (cont.) SECTION 1 - SAFETY ## Crushing and Collision Hazards - Approved head gear must be worn by all operating and ground personnel. - Check work area for clearances overhead, on sides, and bot- tom of platform when lifting or lowering platform, and driving. - During operation, keep all body parts inside platform railing. - Always post a lookout when driving in areas where vision is obstructed. - Keep non-operating personnel at least 6 ft. (1.8m) away from machine during all operations. - Under all travel conditions, the operator must limit travel speed according to conditions of ground surface, congestion, visibility, slope, location of personnel, and other factors caus- ing hazards of collision or injury to personnel. - Exercise extreme caution at all times to prevent obstacles from striking or interfering with operating controls and persons in the platform. - Be sure that operators of other overhead and floor level machines are aware of the aerial work platform's presence. Dis- connect power to overhead cranes. - Warn personnel not to work, stand, or walk under a raised boom or platform. Position barricades on floor if necessary. 1-8 3121197
[2] JLG - Boom Lifts : T350, T500J - Operation (PN 31217420)
Page 22
Open source documentSource excerpt
# SECTION 1 - SAFETY (cont.) ## Tipping Hazards (cont.) SECTION 1 - SAFETY ## Crushing and Collision Hazards - Approved head gear must be worn by all operating and ground personnel. - Check work area for clearances overhead, on sides, and bot- tom of platform when lifting or lowering platform, and driving. - During operation, keep all body parts inside platform railing. - Always post a lookout when driving in areas where vision is obstructed. - Keep non-operating personnel at least 6 ft. (1.8m) away from machine during all operations. - Under all travel conditions, the operator must limit travel speed according to conditions of ground surface, congestion, visibility, slope, location of personnel, and other factors caus- ing hazards of collision or injury to personnel. - Exercise extreme caution at all times to prevent obstacles from striking or interfering with operating controls and persons in the platform. - Be sure that operators of other overhead and floor level machines are aware of the aerial work platform's presence. Dis- connect power to overhead cranes. - Warn personnel not to work, stand, or walk under a raised boom or platform. Position barricades on floor if necessary. 1-8 31217420
[3] JLG - Boom Lifts : T350, T500J - Operation (PN 31215069)
Page 22
Open source documentSource excerpt
# SECTION 1 - SAFETY (cont.) ## Tipping Hazards (cont.) SECTION 1 - SAFETY ## Crushing and Collision Hazards - Approved head gear must be worn by all operating and ground personnel. - Check work area for clearances overhead, on sides, and bot- tom of platform when lifting or lowering platform, and driving. - During operation, keep all body parts inside platform railing. - Always post a lookout when driving in areas where vision is obstructed. - Keep non-operating personnel at least 6 ft. (1.8m) away from machine during all operations. - Under all travel conditions, the operator must limit travel speed according to conditions of ground surface, congestion, visibility, slope, location of personnel, and other factors caus- ing hazards of collision or injury to personnel. - Exercise extreme caution at all times to prevent obstacles from striking or interfering with operating controls and persons in the platform. - Be sure that operators of other overhead and floor level machines are aware of the aerial work platform's presence. Dis- connect power to overhead cranes. - Warn personnel not to work, stand, or walk under a raised boom or platform. Position barricades on floor if necessary. 1-8 31215069
[4] JLG - Boom Lifts : T350, T500J - Operation (PN 31219042)
Page 22
Open source documentSource excerpt
# SECTION 1. +SAFETY (cont.) ## Tipping Hazards (cont.) SECTION 1 - +SAFETY ## Crushing and Collision Hazards - Approved head gear must be worn by all operating and ground personnel. - Check work area for clearances overhead, on sides, and bot- tom of platform when lifting or lowering platform, and driving. - During operation, keep all body parts inside platform railing. - Always post a lookout when driving in areas where vision is obstructed. - Keep non-operating personnel at least 6 ft. (1.8m) away from machine during all operations. - Under all travel conditions, the operator must limit travel speed according to conditions of ground surface, congestion, visibility, slope, location of personnel, and other factors caus- ing hazards of collision or injury to personnel. - Exercise extreme caution at all times to prevent obstacles from striking or interfering with operating controls and persons in the platform. - Be sure that operators of other overhead and floor level machines are aware of the aerial work platform's presence. Dis- connect power to overhead cranes. - Warn personnel not to work, stand, or walk under a raised boom or platform. Position barricades on floor if necessary. 1-8 31219042
[5] JLG - Boom Lifts : 400SC, 460SJC - Operation
Page 20
Open source documentSource excerpt
# Safety Precautions (cont.) ## WARNING (cont.) Safety Precautions Table 2. Beaufort Scale (For Reference Only) (continued) <table><tr><th rowspan="2">Beau- fort Number</th><th colspan="2">Wind Speed</th><th rowspan="2">Description</th><th rowspan="2">Land Conditions</th></tr><tr><td>mph</td><td>m/s</td></tr><tr><td>5</td><td>19-24</td><td>8.0-10.7</td><td>Fresh breeze</td><td>Smaller trees sway.</td></tr><tr><td>6</td><td>25-31</td><td>10.8-13.8</td><td>Strong breeze</td><td>Large branches in motion. Flags waving near horizontal. Umbrella use becomes difficult.</td></tr><tr><td>7</td><td>32-38</td><td>13.9-17.1</td><td>Near Gale/ Moderate Gale</td><td>Whole trees in motion. Effort needed to walk against the wind.</td></tr><tr><td>8</td><td>39-46</td><td>17.2-20.7</td><td>Fresh Gale</td><td>Twigs broken from trees. Cars veer on road.</td></tr><tr><td>9</td><td>47-54</td><td>20.8-24.4</td><td>Strong Gale</td><td>Light structure damage.</td></tr></table> ## 1.3.5 Crushing and Collision Hazards - Approved head gear must be worn by all operating and ground personnel. - Watch for obstructions around machine and overhead when driving. Check clearances above, on sides, and bottom of platform during all operations. - During operation, keep all body parts inside platform railing. - Use the boom functions, not the drive function, to position the platform close to obstacles. - Always post a lookout when driving in areas where vision is obstructed. - Keep non-operating personnel at least 6 ft (1.8 m) away from machine during all operations. - Under all travel conditions, the operator must limit travel speed according to conditions of ground surface, congestion, visibility, slope, location of personnel, and other factors. - Be aware of stopping distances in all drive speeds. When driving in high speed, reduce drive speed before stopping. Travel grades in low speed only. 20 3122338400 460SJC
Keep exploring.
Write a risk assessment for FAHU replacement
A suitable safe system of work for replacing a Fresh Air Handling Unit (FAHU) should begin with a task-specific risk assessment, coordination with the client/site operator, and a permit-to-work package covering isolation, lifting, work at height, electrical work, hot work if applicable, and any confined-space elements.
Read the threadWrite a risk assessment for Write a risk assessment and a method statement for infrastructure
A suitable RAMS for infrastructure works should be built around a task-by-task risk assessment, a documented safe system of work, competent supervision, and continuous review as site conditions change. Start with a baseline survey of the workplace, work processes, tasks, and equipment; then break each activity into
Read the threadfor a site attendance, what questions should be asked?
During a site attendance or site visit, the key safety objective is to confirm that hazards have been identified, risks assessed, and effective controls implemented before and during the work. A strong site visit should test whether the work is planned, supervised, communicated, and carried out in compliance with the
Read the threadWrite a risk assessment for House refurbishment
For house refurbishment and renovation works, the risk assessment should be task-specific, site-specific, and reviewed as the job changes. Under UK good practice and CDM principles, start by identifying hazards, who may be harmed, existing controls, and additional controls required, then communicate the findings to all
Read the threadde beers safety standards
De Beers Safety Standards and Critical Safety Procedures ======================================================== This document outlines the safety standards and critical safety procedures necessary to ensure a safe working environment and prevent workplace accidents, based on industry best practices and regulatory
Read the threadcreate a Job Hazard Analysis for a electrical contractor doing a start up of a new electrical switchboard
JHA for Electrical Switchboard Startup and Commissioning ======================================================== *Assessment Date:** \[DATE] *Assessor:** \[ASSESSOR NAME] *Department/Area:** \[DEPARTMENT/AREA] *Review Date:** \[REVIEW DATE] 1\. Assessment Scope This Job Hazard Analysis (JHA) covers the initial startup
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.