Published by SALUSLockout/Tagout (LOTO) is a critical safety procedure used to ensure that machines and equipment are properly shut off and not able to be started up again prior to the completion of maintenance or servicing work. Here are some key points and actionable steps based on the provided documents:
- Energy Control Program: Employers must establish a comprehensive energy control program that includes procedures for lockout/tagout, employee training, and periodic inspections to ensure compliance and safety [1].
- Application of Lockout/Tagout: Only authorized employees should apply lockout or tagout devices. These devices must be affixed to each energy isolating device to ensure that the equipment cannot be operated until the lockout device is removed [2].
- Verification of Isolation: Before starting work on machines or equipment that have been locked out or tagged out, authorized employees must verify that isolation and de-energization have been accomplished [3].
- Release from Lockout/Tagout: Before removing lockout or tagout devices and restoring energy, the work area must be inspected to ensure that nonessential items have been removed and that all employees are safely positioned or removed. Affected employees must be notified that the devices have been removed [3].
- Group Lockout/Tagout: When servicing is performed by a group, a procedure must be used that provides the same level of protection as a personal lockout/tagout device. Each authorized employee must affix a personal lockout or tagout device to the group lockout device when they begin work and remove it when they stop [4].
- Shift Changes: Specific procedures must be in place during shift or personnel changes to ensure the continuity of lockout or tagout protection, minimizing exposure to hazards from unexpected energization [4].
- Training and Retraining: Employees must be trained and retrained whenever there is a change in job assignments, machines, equipment, or processes that present a new hazard, or when there is a change in energy control procedures [2].
By following these guidelines, workplaces can significantly reduce the risk of accidents related to the unexpected energization or startup of machines and equipment.
Sources used for this answer
[1] Occupational Safety and Health Standards (OSHA 29 CFR 1910)
Page 116
Open source documentSource excerpt
## 29 CFR 1910 (OSHA) appurtenances. It is commonly used to replace or add sections of pipeline without the interruption of service for air, gas, water, steam, and petrochemical distribution systems. Lockout. The placement of a lockout device on an energy isolating device, in accordance with an established procedure, ensuring that the energy isolating device and the equipment being controlled cannot be operated until the lockout device is removed. Lockout device. A device that utilizes a positive means such as a lock, either key or combination type, to hold an energy isolating device in a safe position and prevent the energizing of a machine or equipment. Included are blank flanges and bolted slip blinds. Normal production operations. The utilization of a machine or equipment to perform its intended production function. Servicing and/or maintenance. Workplace activities such as constructing, installing, setting up, adjusting, inspecting, modifying, and maintaining and/or servicing machines or equipment. These activities include lubrication, cleaning or unjamming of machines or equipment and making adjustments or tool changes, where the employee may be exposed to the unexpected energization or startup of the equipment or release of hazardous energy. Setting up. Any work performed to prepare a machine or equipment to perform its normal production operation. Tagout. The placement of a tagout device on an energy isolating device, in accordance with an established procedure, to indicate that the energy isolating device and the equipment being controlled may not be operated until the tagout device is removed. Tagout device. A prominent warning device, such as a tag and a means of attachment, which can be securely fastened to an energy isolating device in accordance with an established procedure, to indicate that the energy isolating device and the equipment being controlled may not be operated until the tagout device is removed. - (c) General -(1) Energy control …
[2] Occupational Safety and Health Standards (OSHA 29 CFR 1910)
Page 121
Open source documentSource excerpt
## 29 CFR 1910 (OSHA) - (B) Where a tag cannot be affixed directly to the energy isolating device, the tag shall be located as close as safely possible to the device, in a position that will be immediately obvious to anyone attempting to operate the device. - (5) Stored energy. (i) Following the application of lockout or tagout devices to energy isolating devices, all potentially hazardous stored or residual energy shall be relieved, disconnected, restrained, and otherwise rendered safe. - (ii) If there is a possibility of reaccumulation of stored energy to a hazardous level, verification of isolation shall be continued until the servicing or maintenance is completed, or until the possibility of such accumulation no longer exists. - (6) Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. - (e) Release from lockout or tagout. Before lockout or tagout devices are removed and energy is restored to the machine or equipment, procedures shall be followed and actions taken by the authorized employee(s) to ensure the following: - (1) The machine or equipment. The work area shall be inspected to ensure that nonessential items have been removed and to ensure that machine or equipment components are operationally intact. - (2) Employees. (i) The work area shall be checked to ensure that all employees have been safely positioned or removed. - (ii) After lockout or tagout devices have been removed and before a machine or equipment is started, affected employees shall be notified that the lockout or tagout device(s) have been removed. - (3) Lockout or tagout devices removal. Each lockout or tagout device shall be removed from each energy isolating device by the employee who applied the device. Exception to paragraph (e)(3): When the authorized employee who applied the lockout or tagout device is…
[3] Occupational Safety and Health Standards (OSHA 29 CFR 1910)
Page 122
Open source documentSource excerpt
## 29 CFR 1910 (OSHA) isolating device and the machine or equipment energized to test or position the machine, equipment or component thereof, the following sequence of actions shall be followed: - (i) Clear the machine or equipment of tools and materials in accordance with paragraph (e)(1) of this section; - (ii) Remove employees from the machine or equipment area in accordance with paragraph (e)(2) of this section; - (iii) Remove the lockout or tagout devices as specified in paragraph (e)(3) of this section; - (iv) Energize and proceed with testing or positioning; - (v) Deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue the servicing and/or maintenance. - (2) Outside personnel (contractors, etc.). (i) Whenever outside servicing personnel are to be engaged in activities covered by the scope and application of this standard, the on-site employer and the outside employer shall inform each other of their respective lockout or tagout procedures. - (ii) The on-site employer shall ensure that his/her employees understand and comply with the restrictions and prohibitions of the outside employer's energy control program. - (3) Group lockout or tagout. (i) When servicing and/or maintenance is performed by a crew, craft, department or other group, they shall utilize a procedure which affords the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device. - (ii) Group lockout or tagout devices shall be used in accordance with the procedures required by paragraph (c)(4) of this section including, but not necessarily limited to, the following specific requirements: - (A) Primary responsibility is vested in an authorized employee for a set number of employees working under the protection of a group lockout or tagout device (such as an operations lock); - (B) Provision for the authorized employee to ascertain the exposure status of individual group …
[4] Occupational Safety and Health Standards (OSHA 29 CFR 1910)
Page 120
Open source documentSource excerpt
## 29 CFR 1910 (OSHA) - (A) Retraining shall be provided for all authorized and affected employees whenever there is a change in their job assignments, a change in machines, equipment or processes that present a new hazard, or when there is a change in the energy control procedures. - (B) Additional retraining shall also be conducted whenever a periodic inspection under paragraph (c)(6) of this section reveals, or whenever the employer has reason to believe, that there are deviations from or inadequacies in the employee's knowledge or use of the energy control procedures. - (C) The retraining shall reestablish employee proficiency and introduce new or revised control methods and procedures, as necessary. - (iv) The employer shall certify that employee training has been accomplished and is being kept up to date. The certification shall contain each employee's name and dates of training. - (8) Energy isolation. Lockout or tagout shall be performed only bythe authorized employees who are performing the servicing or maintenance. - (9) Notification of employees. Affected employees shall be notified by the employer or authorized employee of the application and removal of lockout devices or tagout devices. Notification shall be given before the controls are applied, and after they are removed from the machine or equipment. - (d) Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: - (1) Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. - (2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipme…
Keep exploring.
Create a SWP for concrete mixing
Concrete Mixing Safe Work Procedure =================================== Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This Safe Work Procedure (SWP) outlines the necessary safety precautions and procedures for the safe mixing of
Read the threadMake me a 10 minute tool Box Talk focused on safety in electrical construction
Electrical Safety in Construction ================================= *Date:** 2025-09-04 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To increase awareness of electrical hazards on construction sites and provide practical steps to prevent electrical injuries.
Read the threadWrite a toolbox talk on Electrical Safety & Lockout/Tagout (LOTO)
Electrical Safety and Lockout/Tagout (LOTO) Procedures ====================================================== *Date:** 2026-01-14 *Duration:** \[DURATION] minutes *Presenter:** \[PRESENTER NAME] *Location:** \[LOCATION] Objective To understand electrical safety hazards and implement Lockout/Tagout (LOTO) procedures to
Read the threadCreate a detailed toolbox talk on block out and tag out.
Toolbox Talk: Lockout/Tagout (LOTO) *Date:** [DATE] *Duration:** [DURATION] minutes *Presenter:** [PRESENTER NAME] *Location:** [LOCATION] Objective The objective of this toolbox talk is to educate participants on the importance of Lockout/Tagout (LOTO) procedures to prevent the unexpected energization or startup of
Read the threadwhat are ppe guidelibes for BC
Personal Protective Equipment (PPE) Guidelines and Safety Protocols for Handling Butyl Carbitol (BC) ==================================================================================================== This document outlines the recommended personal protective equipment (PPE) and safety protocols for handling Butyl
Read the threadGive me an electrical contractor's employee orientation form for Southern California
Employee Safety Orientation for Electrical Contractors in Southern California ============================================================================= Document Number: \[SWP-NUMBER] Revision Date: \[DATE] Next Review Date: \[NEXT REVIEW DATE] Department: \[DEPARTMENT NAME] 1\. Scope This safety orientation form
Read the threadAdd your experience.
Community answers can add practical context. They are moderated, but they are not SALUS-reviewed safety guidance.
New contributions are temporarily closed while the moderation queue is configured.
Community answers(0)
No community answers have been approved yet.
Comments on Rosie's answer(0)
No comments have been approved yet.